Legislation Details

File #: 26-2229    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/31/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Request for approval of a change in contract with Forde Construction Co. in connection with final construction of Bridge Repair - Stuebner Airline Rd Bridge K100 - 2024, adding 1 calendar day, with an addition in the amount of $197,049.18, Job No. 24/0303-1, UPIN 24103MF3A801, Precinct 3, MWBE Contracted Goal: 30.62% MWBE Current Participation: 16.17%.
Attachments: 1. 26-2229-CIC-24103MF3A801-Stuebner Airline-24-0303-1-Final-Forde Constr-P3-04162026

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0303, UPIN 24103MF3A801

Vendor/Entity Legal Name (if applicable): Forde Construction Co.

 

MWBE Contracted Goal (if applicable): 30.62%

MWBE Current Participation (if applicable): 16.17%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Forde Construction Co. in connection with final construction of Bridge Repair - Stuebner Airline Rd Bridge K100 - 2024, adding 1 calendar day, with an addition in the amount of $197,049.18, Job No. 24/0303-1, UPIN 24103MF3A801, Precinct 3, MWBE Contracted Goal: 30.62% MWBE Current Participation: 16.17%.

end

 

Background and Discussion:

Bridge Repair - Stuebner Airline Rd Bridge K100 is located at Stuebner Airline Road, crossing over Cypress Creek. The Scope of Work for this project includes, but not limited to concrete spall repairs, bearing pads replacements, erosion control and slope regrading, Guardrail repairs, concrete channel lining, removal of structural - abutment backwall at the Stuebner Airline Rd bridge over HFCD Channel K100-00-00 (Cypress Creek) within Harris County, Precinct 3.

 

The Changes in contract include:

•                     An additional quantity of 1430 Cubic Yard of borrow material is needed for the existing line item #04 to complete the work proposed in the design plan with an additional cost of $168,740.00 and zero calendar days.

•                     An additional quantity of 225 Linear of metal beam guard fence is needed for the existing line item #011 to complete the work proposed in the design plan with an additional cost of $13,500.00 and zero calendar days.

•                     An additional quantity of 7 Elastomeric bearing pads is needed for the existing line item #032 to complete the work proposed in the design plan with an additional cost of $2,800.00 and zero calendar days.

•                     An additional quantity of 0.42 Acre of Hydro mulch is needed for the existing line item #040 to complete the work proposed in the design plan with an additional cost of $10,500.00 and zero calendar days.

•                     An additional quantity of 12 cubic yards of flowable fill is needed for the new line item #055 to complete the work proposed in the design plan with an additional cost of $24,000.00 and zero calendar days.

•                     A new line item is needed to install 4 shear keys based on field condition and according to the proposed revised design plan with an additional cost of $12,269.88 and zero calendar days.

•                     A new line item is needed for 1,250 linear feet of roadway stripping based on field conditions and according to the proposed plan with an additional cost of $4,637.50 and zero calendar days.

•                     Adding additional 1 Calendar Day to complete the work in RFI-09.

•                     A new line item is needed to deduct the - $39,398.20 for unused amount from line items.

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated.

 

Alternative Options:

There is no other alternative available except the requested changes will allow the contractor to complete the proposed work according to the design plan and complete the project.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/10/2024

354 (24-7519)

Contract Award

 

Location:

Address (if applicable): Stuebner Airline Road at Cypress Creek Houston, TX 77002

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$197,049.18

$197,049.18

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$197,049.18

$197,049.18

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

 

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$197,049.18

$197,049.18

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 4/16/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B