Legislation Details

File #: 25-0584    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/10/2025 In control: Commissioners Court
On agenda: 1/23/2025 Final action: 1/23/2025
Title: Request for approval to execute an amendment to an agreement with DAE & Associates LTD., d/b/a Geotech Engineering & Testing in the amount of $55,029.50 for Professional Engineering Services regarding Construction Materials Testing and related Services for Bernadine Estates & Tower Oaks Sec 3 Subdivision Drainage Improvements - 2018 aka Bernadine Drainage Improvements, UPIN 19103MF12J01, Precinct 3, MWBE Contracted Goal: 100%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 19103MF12J01, Job No. 23/0317

Vendor/Entity Legal Name (if applicable): DAE & Associates LTD., d/b/a Geotech Engineering & Testing

 

MWBE Contracted Goal (if applicable): 100% - MWBE/HUB/DBE

MWBE Current Participation (if applicable): 100% - MWBE/HUB/DBE

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an amendment to an agreement with DAE & Associates LTD., d/b/a Geotech Engineering & Testing in the amount of $55,029.50 for Professional Engineering Services regarding Construction Materials Testing and related Services for Bernadine Estates & Tower Oaks Sec 3 Subdivision Drainage Improvements - 2018 aka Bernadine Drainage Improvements, UPIN 19103MF12J01, Precinct 3, MWBE Contracted Goal: 100%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

 

Construction of underground drainage utilities and reconstruction of driveways and roadway in the Bernadine

Estates & Tower Oaks Sec 3 Subdivision.

 

 

Expected Impact:

 

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

 

 

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/02/22

54 (22-4633)

Approved Interlocal Agreement

10/11/2022

90 (22-6085)

Approved Public Necessity

04/25/2023

75 (23-2266)

Approved Financial Authorization

04/25/2023

76 (23-2267)

Approved Financial Authorization

08/29/2023

47 (23-5005)

Approved Award of Agreement

10/31/2023

97 (23-6263)

Approved Utility Agreement - SOLS

11/14/2023

29 (23-6783)

Approved Contract Award

04/23/2024

82 (24-2241)

Approved Change in Contract - 1

06/25/2024

58 (24-3742)

Approved Change in Contract - 2

08/06/2024

64 (24-4547)

Approved Change in Contract - 3

10/08/2024

65 (24-6277)

Approved Change in Contract - 4

 

Location:

Address (if applicable): Bernadine Estates & Tower Oaks Sec 3 Subdivision.

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$55,029.50

$55,029.50

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$55,029.50

$55,029.50

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$55,029.50

$55,029.50

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/23/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable):