Department: County Engineer
Department Head/Elected Official: Loyd Smith, P.E., Interim County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 19101MF16C01
Vendor/Entity Legal Name (if applicable): Jones & Carter, Inc.
MWDBE Participation (if applicable): N/A
Request Summary (Agenda Caption):
title
Request for approval to execute an amendment to an agreement with Jones & Carter, Inc. in the amount of $79,475.00 for Professional Engineering Services in connection with Long Play Subdivision Drainage Improvements, UPIN 19101MF16C01, Precinct 1.
end
Background and Discussion:
The Long Play subdivision has an area of approximately 25 acres and is located in the eastern portion of Harris County. The subdivision is bisected by Long Play Lane, which intersects Garrett Lane approximately 1 mile east of Beltway 8. The Long Play Lane subdivision has experienced structural flooding during several recent flood events. The scope and proposed improvements include correcting roadside ditches and upsizing culverts. This addendum includes the study and design of the work needed on the roadside ditches along with the study and layout of a proposed trail that is being requested by Precinct 1.
Expected Impact:
By adding to the existing contract, it will allow the additional study work that is needed to ensure this project will reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to the homes in the community. This contract amendment is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Pine Trails subdivision homeowners, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Fund, Special Mobility Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future.
Alternative Options:
Three (3) alternative options were looked into to determine the additional scope of work necessary to meet the Pct. 1 team needs. All alternatives included modification of the roadside ditched for the layout of the proposed trail. One was selected o move forward with.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
x Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
10/8/2019 |
1.g.2 |
Contract Award |
5/19/2020 |
1.g.5 |
Contract Amendment for additional funds |
Location:
Address (if applicable): Long Play Subdivision
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
Professional Engineering Services |
FY 21-22 |
Estimates |
|
|
|
FY 22 |
Next 3 FYs |
Incremental Expenditures |
Labor Expenditures |
- |
- |
- |
Non-Labor Expenditures |
$345,293 |
- |
- |
Total Incremental Expenditures |
$345,293 |
- |
- |
Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify) |
Existing Budget |
FUND 1080 Special Mobility Funds |
$195,712 |
- |
- |
|
Fund 1080 Special Mobility Funds |
$149,581 |
- |
- |
|
- |
- |
- |
- |
Total Current Budget |
$345,293 |
- |
- |
Additional Budget Requested |
- |
- |
- |
- |
|
Fund 1080 Special Mobility Funds- |
$79,475 |
- |
- |
|
- |
- |
- |
- |
Total Additional Budget Requested |
$79,475 |
- |
- |
Total Funding Sources |
$424,768 |
- |
- |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Implementation Date: October 12, 2021
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Marcus Baskin, Manager, Recovery and Resiliency Division, Harris County Engineering Department
Attachments (if applicable): Contract Document