Legislation Details

File #: 26-2870    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/29/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval of a change in contract with Yellowstone Landscape Central, Inc., in connection with On-Call - Maintenance Mowing Humbe Camp Area, Precinct 3 - 2022, with an addition in the amount of $4,062.20, Job No. 22/0065-1, UPIN 22103MF2HJ01, Precinct 3, MWBE Contracted Goal: 19.67%, MWBE Current Participation: 19.17%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0065, UPIN 22103MF2HJ01

Vendor/Entity Legal Name (if applicable): Yellowstone Landscape Central, Inc.

 

MWBE Contracted Goal (if applicable): 19.67%

MWBE Current Participation (if applicable): 19.17%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Yellowstone Landscape Central, Inc., in connection with On-Call - Maintenance Mowing Humbe Camp Area, Precinct 3 - 2022, with an addition in the amount of $4,062.20, Job No. 22/0065-1, UPIN 22103MF2HJ01, Precinct 3, MWBE Contracted Goal: 19.67%, MWBE Current Participation: 19.17%.

end

 

Background and Discussion:

Project includes the mowing and maintenance of Humble camp at various locations throughout Precinct 3.  The change in contract adds $4,062.20 to the contract amount, compensating the Contractor for the work completed within the mowing cycle of this contract.  This project seeks to assist the alleviation of debris in the community all while mowing and weed eating, esplanades and ditches.

 

Change includes adding bid Item #004 (PCO-14):

1-                     Item 004 - Detention Basin - $213.80 (19 visits, Total Cost = $4,062.20, 0 days)

All missing in the current bid. 

 

Expected Impact:

Change allows the Contractor to be compensated appropriately for mowing new detention basin at the request of Precinct 3.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/05/2022

168 (22-2271)

Contract Award

04/04/2023

252 (23-1993)

Contract Renewal

04/23/2024

295 (24-2355)

Contract Renewal

05/22/2025

162 (25-3199)

Contract Renewal

02/26/2026

156 (26-1258)

Contract Renewal

 

Location: Precinct 3

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$4,062.20

$4,062.20

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$4,062.20

$4,062.20

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$4,062.20

$4,062.20

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B