Title: Request for approval of the Traffic and Pedestrian Study - Old Town Spring in Precinct 3, UPIN 23103MF2N101.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 23103MF2N101

Vendor/Entity Legal Name (if applicable): Gradient Group, LLC

 

MWDBE Contracted Goal (if applicable): 100%

MWDBE Current Participation (if applicable): 83%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of the Traffic and Pedestrian Study - Old Town Spring in Precinct 3, UPIN 23103MF2N101.

end

 

Background and Discussion:

The Traffic and Pedestrian Study - Old Town Spring evaluated on-street parking, sidewalks, shared-use paths, pedestrian and ADA ramps, crosswalks, signage, etc. Services also included evaluating existing emergency signal devices to determine if modifications or replacements were needed to improve public safety. A public outreach campaign was conducted with Precinct 3 to seek input from the Old Town Spring Improvement District (OTSID). The area included streets west of the Spring Cypress Road and Brandt Road intersection, Preston Avenue to the north, east of West Hardy Road, and south just past Spring School Road.

 

Expected Impact:

This study evaluated all roads within OTSID and provided recommendations for traffic and pedestrian improvements and/or safety. Recommendations allow for strategic implementation based on the data collected and outreach performed.

 

 

Alternative Options:

Without this study and recommendations, the Old Town Spring area would continue to feel the effects of a transportation and mobility infrastructure that does not meet the infrastructure and safety needs of the residents, businesses, and visitors.

 

 

Alignment with Goal(s):

X Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

X Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

5/24/2022

98

ATN Approval

9/27/2022

33

Consultant Agreement

 

Location:

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Other

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$0

$0

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: May 8, 2025

Anticipated Implementation Date (if different from Court date): n/a

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director, Community Planning & Transportation

 

Attachments (if applicable): Study Report and Appendices