Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): A500-09-00-E001
Vendor/Entity Legal Name (if applicable): McDonough Engineering Corporation
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by McDonough Engineering Corporation dated May 15, 2024, and titled Friendswood Regional Stormwater Detention Basin (Clear Creek Watershed, Bond ID CI-62, Project ID A500-09-00-E001, Precinct 2).
end
Background and Discussion:
This is a partnership project between the City of Friendswood, Galveston County, Galveston Consolidated Drainage District, and the Flood Control District. The objective of this project is to reduce peak flows and decrease the water surface elevation along Clear Creek Channel (A100-00-00). Three alternatives were evaluated during the PER phase and alternative 2 has been selected, which is a dry bottom basin that provides total 710 acre-feet of storage volume.
Expected Impact:
Benefits for alternative 2 include removing 87 structures from the floodplain, 97 acres from the inundation area and 0.7 miles of roadway for the 100-year storm event.
Alternative Options:
The alternative should the PER not be accepted is the Flood Control District will not be able to proceed with design and construction of the project and flood risk will remain the same.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any): N/A
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): 2501 Dixie Farm Road, Houston, TX 77089
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: August 27, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Map