Legislation Details

File #: 25-5128    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Request for approval of a change in contract with Precise Services, Inc., in connection with HCSFNC - TO6 - Connorvale Development, adding 140 calendar days, with no change in the amount, Job No. 24/0139-2, UPIN 21289MF1Z501, Precinct 2, MWBE Contracted Goal: 25.22%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0139, UPIN 21289MF1Z501

Vendor/Entity Legal Name (if applicable): Precise Services, Inc.

 

MWBE Contracted Goal (if applicable): 25.22%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Precise Services, Inc., in connection with HCSFNC - TO6 - Connorvale Development, adding 140 calendar days, with no change in the amount, Job No. 24/0139-2, UPIN 21289MF1Z501, Precinct 2, MWBE Contracted Goal: 25.22%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

After Hurricane Harvey exposed a major shortage of affordable housing in Harris County, the Single-Family New Construction Program (SFNC) began connecting residents with newly built, affordable homes in growing communities across the county.

Scope of work - Task Order 6: This phase of construction consists of the infrastructure development to support single-family affordable housing.  This includes construction of roadways and sidewalks, Installation of sanitary sewer and storm systems, Pavement improvements, Construction of a lift station and detention ponds to serve East Aldine Estates in Precinct 2.

The change involves a 140-calendar-day extension to the contract.  Additional time is required due to unforeseen site conditions and the presence of unsuitable subgrade materials in specific locations that significantly hinder progress along the project's critical paths for excavation, pavement construction, grading, and other related work. This time extension is necessary to complete the remaining works and is granted in accordance with Section 5.27 (Project Delays) of the General Conditions.

 

Expected Impact:

This change order extends the contract duration by 140 calendar days, adjusting the project completion date to July 21, 2025.

 

Alternative Options:

No alternative options.  If no action is taken, the roadway and other infrastructure constructions will not be completed.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/15/2024

255 (24-4245)

Contract Award

03/27/2025

88 (25-1463)

Contract Amendment #1 for additional funds

 

Location:

Address (if applicable): 2201 Connorvale Road

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

         $

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/26/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the county Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B