Legislation Details

File #: 25-5649    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 9/2/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval to execute an agreement with Isani Consultants, L.P in the amount of $134,744.50 for professional engineering services for a rebuild traffic signal with pedestrian related appurtenances at the intersection of Fry Road at Saums Road, UPIN 24035MF3H201, Precinct 4, MWBE Contracted Goal: 19.6%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN - 24035MF3H201

Vendor/Entity Legal Name (if applicable): Isani Consultants, L.P 

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Isani Consultants, L.P in the amount of $134,744.50 for professional engineering services for a rebuild traffic signal with pedestrian related appurtenances at the intersection of Fry Road at Saums Road, UPIN 24035MF3H201, Precinct 4, MWBE Contracted Goal: 19.6%.

end

 

Background and Discussion:

Traffic signals are re-built to improve the operation of an intersection and better facilitate pedestrian activities. The existing signal uses outdated and degrading equipment and does not adequately accommodate pedestrian crossings. Re-building this signal will ensure the intersection is brought to compliance with current standards and will provide pedestrian connectivity.

 

Expected Impact:

Re-building the traffic signal will bring the infrastructure to current standards and specifications and reduce overall maintenance cost. It will also significantly reduce the risk of failure during a catastrophic event.

 

Alternative Options:

To continue to maintain the existing traffic signal and slowly replace degrading parts as they fail. This may potentially be more costly and incurs a risk of failure due to aging infrastructure.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/06/2024

87

ATN - Request for approval to negotiate with Isani Consultants, LP

 

Location:

Address (if applicable): Fry Road at Saums Road

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Traffic Engineering and Operations

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$134,744.50

$134,744.50

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$134,744.50

$134,744.50

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$134,744.50

$134,744.50

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief, Engineering & Architectural Services

 

Attachments (if applicable): Agreement