Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not Applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Financial Authorization
Project ID (if applicable): 19101MF14G01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWBE Contracted Goal (if applicable): Not Applicable
MWBE Current Participation (if applicable): Not Applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not Applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Houmont Park Subdivision Drainage Improvements - 2018, tract number 38, for $11,317.00 which is $3,054.00 over the appraised value, UPIN 19101MF14G01, Precinct 1.
end
Background and Discussion:
This project is in Greens Bayou (P100-00-00) watershed in East Houston, east of John Ralston Road. The existing drainage system is comprised of three earthen, trapezoidal open channels (P110-00-00, P110-04-00 and P117-00-00) owned and maintained by Harris County Flood Control District (HCFCD). The proposed improvements include regrading the existing roadside ditches, 1,000-feet east and west of the existing drainage channels, replacing inadequate driveway and roadway culverts and channel improvements of the HCFCD Unit No P110-00-00, P110-04-00 and P117-00-00. Other improvements include multiple detention basins to cause no adverse impacts downstream.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This modification is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Houmont Park Subdivision homeowners, Harris County, and FEMA. No staffing impacts expected with the fiscal impact for this project coming from the 1080 Fund, Special Mobility Funding for the Recovery and Resiliency Division Subdivision projects with the long-term goal of reducing drainage costs in the future.
Alternative Options:
The project constraints are dominated by available right-of-way. The existing easements are not wide
enough to incorporate 30-foot maintenance berms on both sides of the channel as required by HCFCD
criteria. Many residential properties have structures, such as sheds and carports, that are adjacent to the
existing drainage easements. Furthermore, the proposed ditch improvements are limited by existing gas
pipelines.
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
5/16/2023 |
82 |
Public Necessity Approval |
Location:
Address (if applicable): 7918 Wanda Lane, Houston, TX 77044
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1080 - Infrastructure Fund |
$ |
$11,317.00 |
$11,317.00 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$11,317.00 |
$11,317.00 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$11,317.00 |
$11,317.00 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 5/8/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Michael Ware, Director, Real Property Division
Attachments (if applicable): Survey Map