Legislation Details

File #: 24-3558    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 6/6/2024 In control: Commissioners Court
On agenda: 6/13/2024 Final action: 6/13/2024
Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with Quiddity Engineering, LLC for professional engineering, support services, and construction phase services for flood reduction improvements along Salt Water Ditch for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (230455), MWDBE Contracted Goal: 20%.

Department: Purchasing

Department Head/Elected Official: DeWight Dopslauf

 

Regular or Supplemental RCA:   Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 230455

Vendor/Entity Legal Name (if applicable): Quiddity Engineering, LLC

 

MWDBE Contracted Goal (if applicable): 20%                     

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval on the basis of highest overall evaluation and authorize negotiations with Quiddity Engineering, LLC for professional engineering, support services, and construction phase services for flood reduction improvements along Salt Water Ditch for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (230455), MWDBE Contracted Goal: 20%.

end

 

Background and Discussion:

Salt Water Ditch is a tributary to Sims Bayou that provides drainage to approximately 3.87 square miles of highly urbanized watershed which has led to increased flooding in the area. The Feasibility Study dated January 29, 2021, recommended (1) conversion of the existing Salt Water Ditch into an enclosed storm sewer system, from Calhoun Road to Sims Bayou (approximately 18,200 LF or 3.45 miles), and (2) design and construction of detention basins on sites owned by the City of Houston for flood mitigation. Project is located in south‐central Harris County within the corporate limits of the City of Houston south of I- 610 and east of SH-288. Design is bond funded and Construction is CDBG-MIT funded. The prioritization framework score for this project is 6.30 and occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

 

Expected Impact:

The project will reduce flood risks and strengthen resiliency in the Sims Bayou Watershed by alleviating property and structural damages to adjacent communities. The project will provide flood risk reduction for approximately 1,221 residences in a 100-yr storm event. Project will also reduce the financial impact of recovery costs to Harris County and federal flood insurance program.

 

Alternative Options:

The alternative would be to select another firm for this assignment which would result in significant delays in completing this project.

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

258

Advertisement of Bids

 

Location: HCFCD Unit C118-00-00

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/13/2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department:  Samson D’Silva, P.E., Engineering Project Manager, Capital Projects South, Jared Abbey, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter