File #: 26-3897    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/3/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request by the Office of the Purchasing Agent for approval of an award on the basis of low bid to Texas Materials Group, Inc. in the amount of $4,717,773 for asphalt roadway rehabilitation for - Fuqua Street, Furman Road, and Fellows Road for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (260118), MWBE Contracted Goal: 23.11%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: County Engineer

Secondary Department Head/Elected Official: Milton Rahman

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 260118

Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

 

MWBE Contracted Goal (if applicable): 23.11%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the Purchasing Agent for approval of an award on the basis of low bid to Texas Materials Group, Inc. in the amount of $4,717,773 for asphalt roadway rehabilitation for - Fuqua Street, Furman Road, and Fellows Road for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (260118), MWBE Contracted Goal: 23.11%.

end

 

Background and Discussion:

Harris County Precinct 1 submitted a project to the Office of the County Engineer for an asphalt mill and overlay along Fuqua St. from Furman Rd. to Cullen Blvd., Furman Rd. from Fuqua St. to Fellows Rd., and Fellows Rd. from Furman Rd. to SH 288. The project also includes culvert replacement as needed to ensure capacity and localized ditch grading or regrading to maintain positive drainage to outfalls.

The study phase of the project was conducted from August 17, 2022, through January 9, 2024. Following this, the design phase began on January 24, 2024, and was completed on March 26, 2026. The study and design have been completed, and the bid package has been reviewed by Precinct 1, which has provided concurrence to advertise. Construction is anticipated to begin on June 12, 2026, with an expected construction duration of eight months.

 

Expected Impact:

The expected impact is improved roadway conditions, drivability, and safety through resurfacing of existing pavement.

 

Alternative Options:

Precinct 1 would need to delay the project or identify alternative funding or delivery methods

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Asphalt Reconstruction

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

 $4,717,772

 $4,717,772

 $4,717,772

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

 $4,717,772

 $4,717,772

 $4,717,772

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

 $4,717,772

 $4,717,772

 $4,717,772

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 6/11/2026

Anticipated Implementation Date (if different from Court date): 6/11/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM Chief of Engineering and Architectural Services, Office of the County Engineer; Luke Herdrich, Senior Buyer, Harris County Purchasing Office;

 

Attachments (if applicable): Letter, Bid Table