Title: Transmittal by the Flood Control District of a preliminary engineering report by HR Green Inc. dated March 2025, and titled Channel Conveyance and Stormwater Detention Improvements for Q136-00-00 (Cedar Bayou Watershed, Bond ID F-69, Project ID Q136-00-00-E001, Precinct 3).
Attachments: 1. Q136-00-00-E001 Project Boundary Map.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Transmittal

 

Project ID (if applicable): Q136-00-00-E001

Vendor/Entity Legal Name (if applicable): HR Green Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a preliminary engineering report by HR Green Inc. dated March 2025, and titled Channel Conveyance and Stormwater Detention Improvements for Q136-00-00 (Cedar Bayou Watershed, Bond ID F-69, Project ID Q136-00-00-E001, Precinct 3).

end

 

Background and Discussion:

The purpose of the Preliminary Engineering Report (PER) prepared by HR Green was to identify a drainage improvement project for the Q136-00-00 watershed (a tributary of Cedar Bayou) that will provide water surface elevations reductions within the watershed. The proposed project consists of 1,100 feet of channel improvements, together with an 82 ac-ft detention pond north of Huffman-Eastgate Rd. Supporting design information collected as part of the PER includes topographic survey of the basin and channel in the study area, geotechnical investigation, subsurface utility engineering exploration, jurisdictional wetland delineation, and a threatened and endangered species assessment. 

 

Expected Impact:

The acceptance of this PER will allow the Flood Control District to move into the design stage of the recommended project, once the necessary funding is in place.

 

Alternative Options:

The alternative should this PER not be approved is that the Flood Control District will not be able to proceed to the design phase of our project lifecycle.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/31/2023

149.

Agreement

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map