File #: 24-1081    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 2/27/2024 In control: Commissioners Court
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Request for approval to negotiate with MBCO Engineering LLC. to provide professional engineering services for the design, survey, and rebuild of two traffic signals in connection with pedestrian related appurtenances at Morton Ranch at Waterstone Fall Drive and Kieth Harrow Blvd at Westfield Village Drive in Precinct 4.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): UPIN: 24035MF35J01

Vendor/Entity Legal Name (if applicable): MBCO Engineering LLC.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with MBCO Engineering LLC. to provide professional engineering services for the design, survey, and rebuild of two traffic signals in connection with pedestrian related appurtenances at Morton Ranch at Waterstone Fall Drive and Kieth Harrow Blvd at Westfield Village Drive in Precinct 4.

end

 

Background and Discussion:

Traffic signals are installed to improve the operations of an intersection and better facilitate pedestrian activities. As such, the consultant will be tasked with the signal design of the intersection and an evaluation of left turn lane storage to improve operations. The consultant will also be tasked with evaluating pedestrian accessibility through the provision of crosswalks and associated median nose opening adjustments required to facilitate pedestrian activities.

 

Expected Impact:

Designing and rebuilding the traffic signal at this intersection will improve operations and better facilitate pedestrian activities.

 

Alternative Options:

An alternative is to not rebuild the signal at the intersection, which will not improve operational improvement and pedestrian benefits.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Morton Ranch at Waterstone Fall Dr. & Kieth Harrow Blvd at Westfield Village Dr.

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: February 27th, 2024

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Patrick Mandapaka, PhD, ACIP, Director of Community Resilience & Transportation Planning

Attachments (if applicable): Not Applicable