File #: 24-3867    Version: 1 Name:
Type: Grant Status: Passed
File created: 6/14/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request by the Flood Control District for approval to submit an application to the Texas Division of Emergency Management for grant funds in the amount of $1,383,069, with a required cash match of $461,023, for the P118-08-00-E001 Channel Conveyance Improvements Program (Halls Bayou Watershed, Bond ID C-23, Project ID P118-08-00-E001, Precinct 1).
Attachments: 1. 24-3867

Department: Flood Control District

Department Head/Elected Official: Dr. Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant

 

Project ID (if applicable): P118-08-00-E001

Vendor/Entity Legal Name (if applicable): Texas Division of Emergency Management

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request by the Flood Control District for approval to submit an application to the Texas Division of Emergency Management for grant funds in the amount of $1,383,069, with a required cash match of $461,023, for the P118-08-00-E001 Channel Conveyance Improvements Program (Halls Bayou Watershed, Bond ID C-23, Project ID P118-08-00-E001, Precinct 1).

end

 

Background and Discussion:

It is recommended that the Flood Control District be authorized to submit a full grant application through a FEMA Legislative Pre-Disaster Mitigation (LPDM) Grant seeking funding for the design phase required to support the future improvements along P118-08-00.

 

The proposed P118-08-00 channel improvements include enlarging the channel cross-section in width and depth along a 3,500 linear feet segment of the channel and replacing the three crossing culverts within the segment. 

 

The anticipated federal share for the project is $1,383,069 with a local match of $461,023, for a total of $1,844,092. The funding is available specifically for this project in the FY24 Federal Budget and was submitted by Congresswoman Sheila Jackson-Lee, representing the 18th District of Texas.

 

Expected Impact:

The Flood Control District will utilize its resources to manage engineering consultants for the design of the project as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards.

 

Alternative Options:

The alternative is to not apply for the grant funding, wherein existing flooding risk remain in place, or the project will need to be funded with local funding.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

The P118-08-00 improvements are from the intersection of P118-08-00 and Shreveport Boulevard, east to Parkhurst Road.

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$35,463

$35,463

$425,560

Grant

$

$106,390

$106,390

$1,276,679

Choose an item.

$

$

$

$

Total Current Budget

$

$141,853

$141,853

$1,702,239

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$141,853

$141,853

$1,702,239

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Attachments (if applicable): Court Order, Project Boundary Map, OMB Certification, SF424B, Funding Commitment Letter