File #: 25-2714    Version: 1 Name:
Type: Asset Management Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of a new unit designated as T101-02-00 to be accepted as part of the Flood Control District's maintenance system, which is a channel constructed by Castlewood Municipal Utility District and coordinated by the Channel Ownership Program (Barker Reservoir Watershed, Project ID Z100-00-00-R007, Precinct 4).

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Asset Management

 

Project ID (if applicable): Z100-00-00-R007

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a new unit designated as T101-02-00 to be accepted as part of the Flood Control District’s maintenance system, which is a channel constructed by Castlewood Municipal Utility District and coordinated by the Channel Ownership Program (Barker Reservoir Watershed, Project ID Z100-00-00-R007, Precinct 4).

end

 

Background and Discussion:

The Flood Control District's Channel Ownership and Maintenance Responsibility Program (Channel Ownership Program) was established to address uncertainties regarding drainage infrastructure ownership and maintenance responsibilities within Harris County. Many channels lack formally dedicated drainage easements, have unidentified owners, or have no designated agency responsible for their upkeep. This ambiguity creates challenges in determining accountability for maintenance and responding to public service requests. To resolve these issues, the Channel Ownership Program investigates and identifies channels that meet the program’s criteria. The program coordinates with public agencies to establish ownership and maintenance responsibilities, updates property records to reflect drainage easements dedicated to public entities and assigns a responsible agency for ongoing maintenance.

 

As part of this initiative, the Flood Control District has worked with the Castlewood Municipal Utility District (MUD) to facilitate the transfer of an open channel that was constructed and previously maintained by Castlewood MUD. A primary objective of the Channel Ownership Program is to identify drainage infrastructure within Harris County that was never formally dedicated to the Flood Control District by a MUD and to collaborate with these entities to ensure the proper transfer of right-of-way. This effort enhances the Flood Control District’s ability to manage and maintain critical drainage infrastructure effectively.

 

The specific channel reach under consideration is located within the Barker Reservoir watershed. The proposed action will ensure that this drainage facility receives the necessary maintenance and oversight from the Flood Control District, improving overall flood management within the watershed.

 

Expected Impact:

Accepting this channel for maintenance will add approximately 4.4547 acres of channel right-of-way to the Flood Control District’s responsibilities. This addition will require ongoing maintenance efforts; however, it will ensure that the channel receives consistent oversight and servicing by the Flood Control District’s Infrastructure Division and its mowing contractors. With regular maintenance and monitoring, the channel’s functionality will be preserved, reducing potential drainage issues and enhancing overall flood management within the Barker Reservoir watershed.

 

Alternative Options:

The only alternative would be to take no action and leave the channel under the responsibility of the Castlewood Municipal Utility District. However, this would be detrimental in the long term, as the Flood Control District is better equipped to manage and maintain open channels through its dedicated Infrastructure Division and established maintenance programs. Without the Flood Control District’s oversight, the channel may not receive the necessary level of maintenance, potentially leading to degradation, reduced drainage capacity, and increased flood risk for surrounding areas.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/28/2020

2.a.1

Approval

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): N/A