Legislation Details

File #: 26-1212    Version: 1 Name:
Type: Report Status: Passed
File created: 2/11/2026 In control: Commissioners Court
On agenda: 2/26/2026 Final action: 2/26/2026
Title: Request for approval of a study report prepared by Entech Civil Engineers Inc for Study - Neighborhood Drainage Improvements (Phase 1) - 2025, UPIN 25104MF3TY01, Precinct 4.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 25104MF3TY01

Vendor/Entity Legal Name (if applicable): Entech Civil Engineers Inc

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable):N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a study report prepared by Entech Civil Engineers Inc for Study - Neighborhood Drainage Improvements (Phase 1) - 2025, UPIN 25104MF3TY01, Precinct 4.

end

 

Background and Discussion:

 

The project consists of conducting a Precinct 4-wide desktop analysis to identify areas within the right-of-way (ROW) that may benefit from drainage system maintenance and/or improvements. Findings of the drainage assessment will be used to determine follow-on maintenance work, projects, or additional detailed studies.

 

Expected Impact:

 

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of flooding in various locations across Precinct 4. This study report presents recommended options  for impactful maintenance projects to reduce flood risk.

 

Alternative Options:

 

N/A

 

 

 

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

8/6/24

296

Entech Contract Award

 

Location:

Address (if applicable): Precinct wide

Precinct(s): Precinct 4                     

 

Fiscal and Personnel Summary

Service Name

Study - Neighborhood Drainage Improvements - 2025

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/26/2026                     

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services,

Office of the County Engineer

 

Attachments (if applicable): Study Report