Title: Transmittal by the Flood Control District of a certificate of substantial completion with Mar-Con Services, LLC, for Brookglen Stormwater Detention Basin Phase 1 North Compartment (Armand Bayou Watershed, Bond ID C-06, Job No. 23/0428, Project ID B512-02-00-E001, Precinct 2).
Attachments: 1. 071025 TRANSMITTAL SUB COMP B512-02-00-E001 backup.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): B512-02-00-E001

Vendor/Entity Legal Name (if applicable): Mar-Con Services, LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a certificate of substantial completion with Mar-Con Services, LLC, for Brookglen Stormwater Detention Basin Phase 1 North Compartment (Armand Bayou Watershed, Bond ID C-06, Job No. 23/0428, Project ID B512-02-00-E001, Precinct 2).

end

 

Background and Discussion:

Brookglen Stormwater Detention Basin includes the construction of a dry bottom basin with maintenance path and a floatable screen system on a former neighborhood cul-de-sac. The purpose of this transmittal is to submit the Certificate of Substantial Completion, confirming that the Contractor has fulfilled the scope of work and resolved all punch list items to the satisfaction of the Flood Control District.

 

Expected Impact:

Substantial Completion signifies that a flood control project is largely finished, allowing the Flood Control District to begin using most of the infrastructure to realize intended flood risk reduction benefits while the Contractor completes any applicable minor outstanding details.  The improvements made through this project will reduce flood risk across multiple tributaries in the Cypress Creek Watershed.

 

Alternative Options:

There is no viable alternative to accepting substantial completion when a Contractor successfully completes the work scope of a contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/26/2024

666.

Award

05/22/2025

97.

Change in Contract No. 1

 

Location: Project is located between Spencer Highway and Fairmont Pkwy west of Canada Road.

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 7/10/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Certificate of Substantial Completion and Map