Legislation Details

File #: 24-5076    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/13/2024 In control: Commissioners Court
On agenda: 8/27/2024 Final action: 8/27/2024
Title: Request for approval of a change in contract with WadeCon, LLC, in connection with Beaumont Place Subdivision Drainage Improvements, Job No. 22/0199-10, Bond Fund, UPIN 19101MF17901, Precinct 2, MWDBE Contracted Goal: 21%, MWDBE Current Participation: 15%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0199 - UPIN 19101MF17901

Vendor/Entity Legal Name (if applicable): WadeCon, LLC

 

MWDBE Contracted Goal (if applicable): 21%

MWDBE Current Participation (if applicable): 15%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with WadeCon, LLC, in connection with Beaumont Place Subdivision Drainage Improvements, Job No. 22/0199-10, Bond Fund, UPIN 19101MF17901, Precinct 2, MWDBE Contracted Goal: 21%, MWDBE Current Participation: 15%.

end

 

Background and Discussion:

This project is located in the Greens Bayou watershed near Highway 90 and Beltway 8. The Beaumont Place subdivision consists of mainly roadside ditches and has been subjected to several flooding events with the most recent being Hurricane Harvey (August 2017) and the Tax Day Flood (April 2016). Drainage analysis of the subdivision began in late 2019 as a part of the 2018 Bond program for subdivision drainage improvements. The scope and proposed improvements include roadside ditch regrading, driveway culvert upgrades, expansion of channel along Big Gulch, concrete lined Sulphur Gully channel with reinforced concrete box (RCB) crossing improvements. Improvements also include multiple detention ponds along Big Gulch with an extreme event overflow swale towards the upstream portion of the channel.

 

The Change in contract request includes new items for the following:

•                     Lime Treated Subgrade - Added Item No. 95 Lime Treated Subgrade with a quantity of 3500 Square Yards for an additional cost of $70,000.00, added Item No. 96 Lime Treated Subgrade (6%) with a quantity of 80 Tons for an additional cost of $30,000.00, deducted a quantity of 778 Cubic Yards from Item No. 6 Excavation for a credit of $19,450.00, and deducted a quantity of 1611 Square Yards from Item No. 33 Crushed Aggregate Base Course 8-Inches for a credit of $80,550.00 to yield a total net-zero cost. The EOR proposed a lime stabilized pavement subgrade for Flagstaff Ln as recommended in the geotechnical report.

 

 

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Beaumont Place Subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the original scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/02/2022

22-4428

Contract Award - WadeCon, LLC

05/16/2023

23-2888

Contract Amendment (22/0199-1) for additional funds and extension of project term - Bond

09/19/2023

23-5373

Contract Amendment (22/0199-2) for additional funds and extension of project term - Bond

10/31/2023

23-6463

Contract Amendment (22/0199-3) for additional funds - Bond

10/31/2023

23-6214

Contract Amendment (22/0199-4) for additional funds - Bond

03/26/2024

24-1617

Contract Amendment (22/0199-5) for extension of project term - Bond

06/04/2024

24-3109

Contract Amendment (22/0199-6) for extension of project term - Bond

06/25/2024

24-3630

Contract Amendment (22/0199-7) for additional funds - Bond

06/25/2024

24-3741

Contract Amendment (22/0199-8) for extension of project term - Bond

07/15/2024

24-4054

Contract Amendment (22/0199-9) for additional funds - Bond

 

Location: Beaumont Place Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 27, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)