Legislation Details

File #: 26-4852    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/16/2026 In control: Commissioners Court
On agenda: 7/30/2026 Final action: 7/30/2026
Title: Request for approval of an amendment to an agreement with Scientech Engineers, Inc in the amount of $90,012.00, for professional engineering services in connection with South Diamondhead Blvd - from 500-ft West of Sea Palms Dr. to West of Boom Dr. - 2022, UPIN 23103MF2QZ01, Precinct 3, MWBE Contracted Goal: 23%, Current MWBE Participation: 15%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 23103MF2QZ01

Vendor/Entity Legal Name (if applicable): Scientech Engineers, Inc.

 

MWBE Contracted Goal (if applicable): 23%

MWBE Current Participation (if applicable): 15%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Scientech Engineers, Inc in the amount of $90,012.00, for professional engineering services in connection with South Diamondhead Blvd - from 500-ft West of Sea Palms Dr. to West of Boom Dr. - 2022, UPIN 23103MF2QZ01, Precinct 3, MWBE Contracted Goal: 23%, Current MWBE Participation: 15%.

end

 

Background and Discussion:

Construct the remaining two eastbound lanes of four lane boulevard with asphalt pavement and monolithic concrete curb and gutter. Mill and overlay existing the existing westbound lanes. Construct a two- lane westbound bridge over Gum Gully. The amendment includes separating the project into two phases.

 

Conduct the study and design of a standard four (4) lane concrete boulevard. The goal of studying and designing South Diamondhead Blvd, from 500-ft West of Sea Palms Dr. to West of Boom Dr., is to expand the existing 2-lane half-boulevard roadway to a 4-lane concrete full boulevard and improve mobility in the area.

Expected Impact:

The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.

 

Alternative Options:

If no action is taken, the project may experience delays in improving mobility in the area.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/25/2023

30

Professional Engineering Services agreement approved on court agenda

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$90,012.00

$90,012.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$90,012.00

$90,012.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$90,012.00

$90,012.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/30/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract and Exhibits