Title: Request for approval to execute an agreement with Atlas Technical Consultants, LLC in the amount of $857,800.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Humble Road Place and Parkland Estates Subdivisions Drainage Improvements - 2018, UPIN 21090MF22H01, Precincts 1 and 2, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 25-3438-Award-21090MF22H01-Atlas Technical Consultants LLC-Humble Road Place and Parkland Estates-CMT-2025-P3

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 21090MF22H01; Job No. 25/0113

Vendor/Entity Legal Name (if applicable): Atlas Technical Consultants

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Atlas Technical Consultants, LLC in the amount of $857,800.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Humble Road Place and Parkland Estates Subdivisions Drainage Improvements - 2018, UPIN 21090MF22H01, Precincts 1 and 2, Justification for 0% MWBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

 

This project is located in the North-East Houston area, in the proximity of the US-59 and Beltway 8 Interchange. Humble Road Place subdivision is located within the Precinct 1 boundaries, whereas Parkland Estates lays within the Precinct 2 limits and both subdivisions are part of the Greens Bayou Watershed. The northern part drains into HCFCD Unit No. P133-00-00 and the southern part into HCFCD Unit No. P100-00-00. Over 250 residential structures have flooded during previous storm events, to include Hurricane Harvey. The scope and proposed improvements include roadside ditch regrading, driveway culvert upgrades, underground storm sewer network, and detention ponds. This contract will allow the materials placed during construction to be tested and inspected for Quality Assurance.

 

 

 

Expected Impact:

 

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

1/09/2025

377 (240365)

Approved Authorization to Negotiate

 

Location: Drainage Improvements to Humble Road Place and Parkland Estates Subdivisions Drainage Improvements

Address (if applicable): N/A

Precinct(s): Precincts 1 & 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other    3002

$

$857,800.00

$857,800.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$857,800.00

$857,800.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$857,800.00

$857,800.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 