Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): D500-11-00-E001
Vendor/Entity Legal Name (if applicable): Texas Division of Emergency Management
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept an amendment to an agreement with the Texas Division of Emergency Management to extend the grant end date to September 12, 2026 for the Federal Emergency Management Agency Legislative Pre-Disaster Mitigation - Meyergrove Stormwater Detention Basin Project (Brays Bayou Watershed, Bond ID Z-02, Project ID D500-11-00-E001, Precinct 1).
end
Background and Discussion:
It is recommended that the Flood Control District be authorized to accept an amendment to the Federal Emergency Management Agency Legislative Pre-Disaster Mitigation (FEMA LPDM) Grant Award for the Meyergrove Stormwater Detention Basin project. This grant funding is available for this project in the FY22 Federal Budget and was submitted by US Congresswoman Lizzie Fletcher, representing the 7th District of Texas.
This grant amendment will extend the period of performance by one year to 9/12/2026 and continue to provide financial and technical assistance to the Flood Control District for the Meyergrove Stormwater Detention Basin project. The amendment extends the period of performance by 365 days with no change in funding.
Expected Impact:
This grant will continue to fund the project through construction. The proposed D500-11-00-E001 Meyergrove Stormwater Detention Basin Project will further improve riverine flood risk in the Meyerland area and along Brays Bayou. The two basins will store up to 94 acre-feet during severe rainfall events. The Flood Control District will utilize its resources and applicable consultants during the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards.
Alternative Options:
The alternative is to not to accept the grant amendment, wherein awarded unused grant funding would be returned to FEMA and projects lose funding.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: This action is consistent with the Strategic Plan overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
06/14/2022 |
283. |
Application |
|
01/10/2023 |
310. |
Award |
Location: D500-11-00-E001 Meyergrove Stormwater Detention Basin Project is located between Braeswood Boulevard and Brays Bayou (D100-00-00), as well as East of US Interstate-610 and West of Linkwood Drive.
Address (if applicable):
Precinct(s): Precinct 1
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Grant |
$ |
$5,778,899.00 |
$5,778,899.00 |
$ |
|
Bonds |
$ |
$1,926,299.70 |
$1,926,299.70 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$7,705,188.70 |
$7,705,188.70 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$7,705,188.70 |
$7,705,188.70 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 12/11/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order and Grant Extension Letter