Legislation Details

File #: 24-1501    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/13/2024 In control: Commissioners Court
On agenda: 3/26/2024 Final action: 3/26/2024
Title: Request for approval of an amendment to an agreement with R.R.P. Consulting Engineers, L.L.C., formerly S&B Infrastructure, LTD, in the amount of $100,000, to provide additional construction phase engineering services for the Little York Stormwater Detention Basin. (Halls Bayou Watershed, Bond ID C-35, Project ID P518-10-00-E001, Agreement No. 2022-69, Precinct 2, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible).
Attachments: 1. 032624 AGMT RRP 2022-69 PCT 2 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): P518-10-00-E001

Vendor/Entity Legal Name (if applicable): R.R.P. Consulting Engineers, L.L.C. formerly S&B Infrastructure, LTD

 

MWDBE Contracted Goal (if applicable): 0%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with R.R.P. Consulting Engineers, L.L.C., formerly S&B Infrastructure, LTD, in the amount of $100,000, to provide additional construction phase engineering services for the Little York Stormwater Detention Basin. (Halls Bayou Watershed, Bond ID C-35, Project ID P518-10-00-E001, Agreement No. 2022-69, Precinct 2, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible).

end

 

Background and Discussion:

The P518-10-00-E001 (Phase 2) project is in northeast Houston in Harris County Precinct 2. The purpose of the project is to implement channel conveyance improvements (desilting, slope stabilization, crossing replacements, culvert repair) along P118-14-00 between the Hopper and Little York stormwater detention basins installed during the P518-10-00-E002 (Phase 1) project. Phase 2 will be constructed using the remaining CDBG-DR 2017 Hurricane Harvey Round 1 grant funds remaining from Phase 1.

 

The prior agreement included the funding to carry the engineer of record through design phase services. Additional funding is needed so the engineer of record and complete the bidding and construction phase services. 

 

Expected Impact:

This project seeks to reduce flood risks and strengthen resiliency in Harris County by alleviating property and structural damages to the adjacent community. The objective is to restore channel capacity and increase conveyance of storm water along P118-14-00. This will reduce the financial, physical, and emotional burden flood damages place on homeowners. The engineer of record during the design is a crucial part of completing the bidding and construction phase services.

 

Alternative Options:

There are no viable alternatives to this item being requested. If the engineer of record is not brought on for the bidding and construction phase services, it will be extremely difficult to address questions or clarifications needed during construction.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/30/2021

82.

Agreement

7/18/2023

151.

Consent to Assignment to RRP Consulting Engineers, LLC

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.5 - Planning Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$100,000.01

$100,000.01

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$100,000.01

$100,000.01

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$100,000.01

$100,000.01

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: March 26, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map