Legislation Details

File #: 25-7768    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 11/25/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval to execute an interlocal agreement with the City of Houston to develop a Design Concept Report (DCR) for the Catalina Area Paving and Drainage project, which includes improvements to mobility, drainage, and safety facilities in and around 12106 Barrett Brae Drive, UPIN 25104MF3UK01, Precinct 4.
Attachments: 1. Partnership-UPIN 25104MF3UK01-25GEN1302- Catalina Area Report - DCR.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): 25104MF3UK01

Vendor/Entity Legal Name (if applicable): City of Houston

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an interlocal agreement with the City of Houston to develop a Design Concept Report (DCR) for the Catalina Area Paving and Drainage project, which includes improvements to mobility, drainage, and safety facilities in and around 12106 Barrett Brae Drive, UPIN 25104MF3UK01, Precinct 4.

end

 

Background and Discussion:

The Project will provide multiple benefits by improving aging water and sanitary infrastructure. The DCR will explore LID features for green stormwater infrastructure, and surface detention that could incorporate multi-use functions including open space for recreation.

 

Expected Impact:

When implemented, the project will reduce the risk of flooding for 519 structures. New sidewalks with ADA compliant crosswalks and new high efficiency LED lighting will improve safety and mobility.

 

Alternative Options:

The alternative option for this proposal would be to determine other funding or to complete these items in-house.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: None

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 12106 Barrett Brae Drive.

 

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$250,000

$250,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$250,000

$250,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$250,000

$250,000

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

N/A

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/11/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Bashar Ahmed, PhD, Chief, Strategy & Business Operations, HCED.

 

 

Attachments (if applicable): Interlocal Agreement, Exhibits.