Legislation Details

File #: 24-3213    Version: 1 Name:
Type: Report Status: Passed
File created: 5/22/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of Study Report prepared by R.G. Miller Engineers for Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, 20104MF1BX01, Precinct 3.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 20104MF1BX01

Vendor/Entity Legal Name (if applicable): N/A

 

MWDBE Contracted Goal (if applicable): Not Applicable

MWDBE Current Participation (if applicable): Not Applicable

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of Study Report prepared by R.G. Miller Engineers for Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, 20104MF1BX01, Precinct 3.

end

 

Background and Discussion:

The project will expand Spring Stuebner Road into a four-lane concrete boulevard with a 32-foot raised median and an underground storm sewer system to replace traditional ditches and limit swales. It includes a drainage strategy to comply with Atlas 14, proposing a 25% increase in detention capacity and addressing alignment issues due to existing structures and future developments. Plans also feature optimized intersection and median designs for improved traffic flow and safety, alongside new sidewalks on both sides to enhance pedestrian connectivity. This initiative aims to bolster road capacity and infrastructure resilience to meet future urban demands.

 

Expected Impact:

The designed boulevard is anticipated to greatly improve traffic flow and safety, meeting both current and future transportation needs. With a sophisticated drainage system, it will reduce flooding risks and increase the area's resilience to weather events. Additionally, enhanced pedestrian facilities will boost walkability and accessibility, improving the overall quality of urban life.

 

Alternative Options:

If study report is not approved the project will not be completed.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

          $

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

          $

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 4, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure, HCED

 

Attachments (if applicable): N/A