File #: 24-4706    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/24/2024 In control: Commissioners Court
On agenda: 8/6/2024 Final action: 8/6/2024
Title: Request for approval of a change in contract with Conrad Construction Co., Ltd. in connection with Anderson Road - Hiram Clarke Road to Almeda Road - 2018, adding 11 calendar days, with an addition in the amount of $169,395.00, Job No. 23/0152-2, UPIN 19101MF0XY01, Precinct 1, MWDBE Contracted Goal: 21%, MWDBE Current Participation: 0%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

 

Regular or Supplemental RCA: Regular RCAType of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0152, UPIN 19101MF0XY01

Vendor/Entity Legal Name (if applicable): Conrad Construction Co., Ltd.

 

MWDBE Contracted Goal (if applicable): 21%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Conrad Construction Co., Ltd. in connection with Anderson Road - Hiram Clarke Road to Almeda Road - 2018, adding 11 calendar days, with an addition in the amount of $169,395.00, Job No. 23/0152-2, UPIN 19101MF0XY01, Precinct 1, MWDBE Contracted Goal: 21%, MWDBE Current Participation: 0%.

end

 

Background and Discussion:

Project includes completion of the two-lane concrete curb and gutter road with sidewalk on both sides and left turn lanes at the intersections approximately 7,800 linear feet of Anderson Road construction from 500 feet west of Hiram Clarke Road to Almeda Road/FM 521 (Segment 2).

 

This change in contracts includes:

The increasing of proposed temporary driveway quantity by 38 each. Total on the project is 48 there are only 10 in the bid quantity. ($48,500)

 

Item #38 - Structural Concrete (wingwall) - Increase quantity by 30 cy to construct proposed wingwalls per plans. Bid quantity is short of required amount. ($55,500.00)

 

Item #158 - Install temporary Conflict Manhole - Add new line item to construct conflict manhole around 6” steel water line to avoid delay in project. ($18,980.00 - 4 Days)

 

Item #160 - Adjust Manhole Tops - Add new line item to adjust existing manhole tops in conflict with proposed pavement elevations. ($13,290 - 2 days)

 

Item #48 - Precast Concrete Standard Manhole - Increase existing line item by 1 each to avoid conflict with 12” AC waterline and ATT duck bank. ($7,000)

 

Increase existing line items by 80 cy to demolition and replace an existing driveway and 10 LF of RCP not called out in the drawings. ($17,800)

 

Item #161- Remove existing manholes (all depths) - Add new line item to remove existing manholes called out in the plans. ($8,325 - 2 days)

 

Expected Impact:

Changes allow for compensation to the Contractor for actual quantities used in construction, in accordance with the original intent of the project.

 

Alternative Options:

Revise original scope of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_X Transportation

_X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/27/2023

23-3490

Contract Award

06/25/2024

24-3586

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable): Anderson Road, Houston, Texas 77053

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$169,395.00

$169,395.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$169,395.00

$169,395.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$169,395.00

$169,395.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: August 06, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B