File #: 24-3306    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 5/23/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the construction of enhancements at the Goforth Park and West Road Stormwater Detention Basin. (Bond ID Z-04, Agreement No. 2019-146, Precinct 3).
Attachments: 1. 060424 ILA GOFORTH PARK 2019-146 PCT 3 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Harris County

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the construction of enhancements at the Goforth Park and West Road Stormwater Detention Basin. (Bond ID Z-04, Agreement No. 2019-146, Precinct 3).

end

 

Background and Discussion:

Deputy Darren Goforth Park and the West Road Stormwater Detention Basin/U506-05-00 is situated along upper Horsepen Creek/U106-00-00 in Precinct 3.  Harris County Engineering and Harris County Precinct 3 prepared a design for a pump system to enhance the existing stormwater detention basin. Initially, the Harris County Flood Control District allocated $3,000,000 for construction of this project through Bond ID Z-05. Due to inflation and other rising costs, an additional $1,500,000 is now required to complete the project. The Harris County Flood Control District proposes to cover the difference using funds through Bond ID Z-04, designated for Precinct 3 projects. Once completed, Harris County Precinct 3 will be responsible for the maintenance and operation of the pump system.  

 

Expected Impact:

The joint project and funding structure will facilitate more efficient and cost-effective governmental services.   Additionally, this demonstration project and others like it, is intended to assess the effectiveness of gate and pump systems as a tool in providing flood risk reduction efforts in the region.  Lastly, this project is another example of how Harris County and Harris County Flood Control District leverage shared infrastructure to maximize flood risk reduction benefits.  

 

Alternative Options:

If this Joint Funding Structure is not approved, Harris County Engineering and Harris County Commissioner Precinct 3 will be required to seek additional funding sources to complete the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Goforth Park and West Road Stormwater Detention Basin

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$3,000,000

$3,000,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$3,000,000

$3,000,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$3,000,000

$3,000,000

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 4, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Joint Letter