Legislation Details

File #: 25-0350    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/27/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval to execute an agreement with PGAL, Inc in the amount of $339,041.19 for Construction Phase Services in connection with North Forest Subdivision Drainage Improvements 2018, UPIN 19101MF16R01, Precinct 1, Justification for 0% MWDBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 25-0350-Consultant-19101MF16R01-North Forest-PGAL-P1-01092025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 19101MF16R01

Vendor/Entity Legal Name (if applicable): PGAL, Inc

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with PGAL, Inc in the amount of $339,041.19 for Construction Phase Services in connection with North Forest Subdivision Drainage Improvements 2018, UPIN 19101MF16R01, Precinct 1, Justification for 0% MWDBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

The project is located in north Harris County, Precinct 1, south of FM 1960 and north of Richey Rd, generally bounded by I-45 to the east and Ella Blvd to the west. The North Forest Subdivision lies within the Greens Bayou Watershed. Proposed improvements include an upgraded storm sewer system and a detention basin. This agreement will provide Professional Services from the Engineer of Record during construction phase.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the North Forest community. No impact on project schedule or cost anticipated.

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/18/2018

I.1.f-2

Contract Award for Professional Engineering Services

09/24/2019

i.d.1-12

Authorization to Negotiate for Engineering Services

10/29/2019

1.n.1-5

Study Report Approval

03/30/2021

21-1298

Contract Award for Professional Engineering Services

12/14/2021

21-6691

Public Necessity

05/10/2022

22-2843

Contract - Amendment - for Professional Engineering Services

02/21/2023

23-1163

Study Report Approval

12/19/2023

23-7313

Interlocal Agreement with North Forest Municipal Utility District for Cost Share

12/19/2023

23-7314

Interlocal Agreement with North Forest Municipal Utility District for Maintenance

12/19/2023

23-7551

Contract - Amendment - for Professional Engineering Services

 

Location: North Forest Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$339,041.19

$339,041.19

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$339,041.19

$339,041.19

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$339,041.19

$339,041.19

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer

 

Attachments (if applicable): Construction Phase Services Agreement