File #: 25-2686    Version: 1 Name:
Type: Financial Authorization Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, tract numbers 6 & 7, for $50,955.00 which is $6,175.00 over the appraised value, UPIN 20104MF1C401, Precinct 3.
Attachments: 1. 25-2686-(Financial Authorization)-20104MF1C401-BoudreauxSeg3 Trs.6&7 Increase-P-050825

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not Applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

 

Project ID (if applicable): 20104MF1C401

Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

 

MWBE Contracted Goal (if applicable): Not Applicable

MWBE Current Participation (if applicable): Not Applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not Applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to purchase a certain tract for a negotiated price for Harris County for the public project known as Boudreaux Road Segment 3 - from Old Boudreaux Road to 300' west of Hufsmith-Kohrville Road - 2019, tract numbers 6 & 7, for $50,955.00 which is $6,175.00 over the appraised value, UPIN 20104MF1C401, Precinct 3.

end

 

Background and Discussion:

This project aims to design a four-lane concrete boulevard with a 32-foot raised median, underground storm sewer system, and pedestrian sidewalk within a 100-foot ROW, transitioning from an existing 14-foot median near Old Boudreaux Road. It includes strategic drainage solutions, intersection improvements, and right-of-way verifications, enhancing safety and integrating with ongoing infrastructure projects.

 

Expected Impact:

The project is expected to significantly enhance traffic flow, safety, and infrastructure resilience by providing a modern, well-planned boulevard with improved drainage and pedestrian facilities. It will reduce congestion, accommodate future growth, and integrate seamlessly with surrounding projects, contributing to the overall development and sustainability of the area.

 

Alternative Options:

If no action is taken, this intersection will continue operating under existing conditions.

County Strategic Plan Goal:  Choose an item.

County Strategic Plan Objective: Choose an item.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/15/2024

93

Public Necessity Approval

 

Location:

Address (if applicable): 11806 Boudreaux Road & 20014 Jane Lane, Tomball, TX 77375

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$50,955.00

$50,955.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$50,955.00

$50,955.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$50,955.00

$50,955.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

 

Attachments (if applicable): Survey Map