Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN - 18104MF0RA01
Vendor/Entity Legal Name (if applicable): Scientech Engineers Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Scientech Engineers Inc for Holderrieth Rd Segment 3 - from Hufsmith-Kohrville Rd to Sir Alex Dr - 2017, UPIN 18104MF0RA01, Precinct 3.
end
Background and Discussion:
This project consists of upgrading Holderrieth Road to a standard four (4) lane concrete boulevard in 100-foot ROW with a 20-foot raised median and underground storm sewer system for the limits from Hufsmith-Kohrville Rd to Sir Alex Dr - 2017,connecting the existing Champion Forest pavement sections. The project includes two (2) detention basins, interlocal agreements with developers and Municipal Utility Districts, sidewalks, right-way acquisitions, utility relocations and street lighting. This project was a part of redistricting from Precinct 4 to Precinct 3. As a result, while the study phase for the project began in 2017, completion of the study phase was completed in 2026 due to its reclassification and re-scoping.
Expected Impact:
The project will improve the east-west vehicular mobility for the local community, connecting the Champion Forest existing road sections to major thoroughfares and state highways.
Alternative Options:
Without this project, this road segment will continue operating under the current conditions without the improved 4 lane configuration.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
7/11/2017 |
p. 3 1.f.7 |
Recommendation that the County Judge execute amendments/agreements with: Scientech Engineers, Inc., in the amount of $625,693 and approval of funds not to exceed $1,663,925 for engineering services for improvements to Holderrieth Road, Segment 3 from Hufsmith-Kohrville Road to SH-99 at Champion Forest Drive in Precinct 4 (UPIN 18104MF0RA01). |
|
6/9/2020 |
p. 5 1.f.23 |
Recommendation that the County Judge execute amendments/agreements with: Scientech Engineers, Inc., in the additional amount of $27,819 for engineering services for improvements to Holderrieth Road-3 from Hufsmith-Kohrville Road to SH-99 at Champion Forest Drive in Precinct 4 (UPIN 18104MF0RA01). |
Location: Holderrieth Rd & Hufsmith-Kohrville Rd, Tomball, Texas 77375
Address (if applicable): N/A
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 3/19/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Study Report