Primary Department: Purchasing
Primary Department Head/Elected Official: Paige McInnis
Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 240407
Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC
MWBE Contracted Goal (if applicable): 25.21%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of lowest complete bid to Environmental Allies, LLC in the amount of $4,477,984 for infrastructure improvements on Lockwood Drive between Crites Street and Buffalo Bayou for Precinct 2 and for the County Clerk to execute any applicable bonds to be received (240407), MWBE Contracted Goal: 25.21%.
end
Background and Discussion:
Request for approval of an award on the basis of low bid to Environmental Allies for Construction Infrastructure Improvements on Lockwood Overpass Parking Lot & Improvements, Crites St
to Buffalo Bayou underneath Lockwood along proposed Foley St., 21102MF1SM01, Precinct 2, Job No. 240407, UPIN 21102MF1SM01, in the amount of $4,477,983.50, subject to applicable bonds to be received, MWDBE Contracted Goal: 25.21%
In 2022, Harris County to entered into a Tri-Party agreement with the City of Houston and the Buffalo Bayou Partnership for the development, construction, and maintenance of the Buffalo Bayou East Project.The Lockwood Drive project, a collaboration between the Harris County, City of Houston, and Buffalo Bayou Partnership, aims to enhance vehicular and pedestrian mobility while supporting the ongoing residential and recreational developments along Buffalo Bayou. This regional master plan will increase safety and accessibility through the construction of new roads, sidewalks, traffic signals, parking facilities, and trail connections, benefiting the community and boosting future growth.
Expected Impact:
The project is expected to improve traffic flow and reduce congestion by adding new road connections and a signalized intersection. It will enhance pedestrian safety and mobility with the addition of sidewalks, trails, and lighting. The new parking area under the Lockwood Bridge will provide convenient parking and better utilize existing space. Furthermore, the installation of a stormwater system will improve drainage and mitigate flood risks. Overall, the project will create a safer, more accessible, and better-connected environment for residents and visitors.
Alternative Options:
Not to proceed with the construction of modification to Lockwood Drive at Buffalo Bayou.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
9/27/2022 |
22-6031 |
Request by the County Attorney for discussion and approval for Harris County to enter into a Tri-Party agreement with the City of Houston and the Buffalo Bayou Partnership for the development, construction, and maintenance of the Buffalo Bayou East Project. |
1/9/2025 |
25-0171 |
Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for infrastructure improvements on Lockwood Drive between Crites Street and Buffalo Bayou for Precinct 2 (240407) |
Location:
Address (if applicable): 601 Lockwood Dr, Houston, TX 77011
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
Infrastructure Improvements on Lockwood Drive between Crites Street and Buffalo Bayou for Harris County Precinct 2 |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Other |
$ |
$4,477,983.50 |
$4,477,983.50 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$4,477,983.50 |
$4,477,983.50 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$4,477,983.50 |
$4,477,983.50 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 4/10/2025
Anticipated Implementation Date (if different from Court date): 4/10/2025
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Cassandra Green, PE, Director of Technical Services, OCE; Lyndsey Bars, Senior Buyer, Purchasing
Attachments (if applicable): Letter