Title: Request for approval of a change in contract with First Class Units, Inc. in connection with the New Restroom - A.D. Dyess Park - 2023, adding 53 calendar days, with an addition in the amount of $22,000.00, Job No. 24/0197-1, UPIN 24103MF30N01, Precinct 3, MWBE Contracted Goal: 5.824%, MWBE Current Participation: 6%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E, PMP, CFM, ENV-SP, County Engineer

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, P.E.

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 24/0197, UPIN 24103MF30N01

Vendor/Entity Legal Name (if applicable): First Class Units Inc.

 

MWBE Contracted Goal (if applicable): 5.824%

MWBE Current Participation (if applicable): 6%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with First Class Units, Inc. in connection with the New Restroom - A.D. Dyess Park - 2023, adding 53 calendar days, with an addition in the amount of $22,000.00, Job No. 24/0197-1, UPIN 24103MF30N01, Precinct 3, MWBE Contracted Goal: 5.824%, MWBE Current Participation: 6%.

end

 

Background and Discussion:

This project is located at A.D. Dyess Park, 16822 Kitzman Rd Houston, TX 77429. This project is aimed at replacing an antiquated restroom with a prefabricated restroom with HVAC and all appurtenances per design documents, utilities connection and SWPPP incidental. This change in contract entails a change in roof texture for the prefabricated restroom, 32 LF of 12” RCP as SWPPP item omitted on the bid tabulation and a no cost time extension of 53 calendar days due to prefab building long lead item. The NTP for this project was issued as a whole, a partial NTP was preferable in this case to enable procuration of prefab building.

 

Expected Impact:

Changes allow the completion of the project in accordance with the original intent of the project.

 

Alternative Options:

Should we not move forward with this change order, the prefab building would have a basic roof texture, the RCP pipe would not be installed thus resulting to storm water issues, and the contract delivery would be affected.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

 

 

 

 

 

 

Location:

Address (if applicable): 16822 Kitzman Road Houston, TX 77429

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$22,000.00

$22,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$22,000.00

$22,000.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$22,000.00

$22,000.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Andreas Peeples, CPC, CCM, Director of Capital Projects Facilities- Vertical Design and Construction, Harris County Engineering Department.

 

 

Attachments (if applicable): Harris County Auditor's Form 1258B