Legislation Details

File #: 26-4317    Version: 1 Name:
Type: Proposals/Bids Status: Passed
File created: 6/24/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval to reject the bid(s) received for maintenance and new construction of on-site sewage facilities at various locations for Harris County, and that the project be readvertised at a later date with revised specifications (260033), MWBE Contracted Goal: 1.05%.
Attachments: 1. 26-4317 Rejection Job No. 260033

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: County Engineer

Secondary Department Head/Elected Official: Milton Rahman

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Proposals/Bids

 

Project ID (if applicable): 260033

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): 1.05%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval to reject the bid(s) received for maintenance and new construction of on-site sewage facilities at various locations for Harris County, and that the project be readvertised at a later date with revised specifications (260033), MWBE Contracted Goal: 1.05%.

end

 

Background and Discussion:

A countywide term contract was created to provide the Office of the County Engineer and the Precincts with services to include new construction of On-Site Sewage Facilities and monthly maintenance and operation of existing On-Site Sewage Facilities at various locations within Harris County.  After reviewing the bid tabulation, it was determined that the lowest bidder’s maintenance cost is three times more than the second lowest bidder’s maintenance cost. Based on the bid results and the attached engineer’s recommendation letter, it is recommended to reject all received bids and re-advertise this project.

 

Expected Impact:

This project will need to be readvertised for procurement. 

 

Alternative Options:

The Office of the County Engineer and the Precincts will need to have specific Texas Commission Environmental Quality certified personnel to maintain or install their own On-Site Sewage Facilities.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/26/2026

262

Advertisement Transmittal

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/9/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer; Sheila Rodriguez, Senior Buyer, Purchasing

 

Attachments (if applicable): Letter