Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): Job No. 25/0079, UPIN 23103MF2VT01
Vendor/Entity Legal Name (if applicable): Bridgestone Municipal Utility District
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an interlocal agreement with the Bridgestone Municipal Utility District for a service agreement that adds sewer service to existing water service in connection with Wastewater System Rehabilitation - Spring Camp and Klein Park - 2022, Job No. 25/0079, UPIN 23103MF2VT01, Precinct 3.
end
Background and Discussion:
The wastewater from Spring Camp and Klein Park is currently pumped to an existing On-Site Sewage Facility. Sander Engineering Corporation was tasked with providing design, bid, and construction phase services for the design and construction of a lift station, force main, and sanitary sewers to eliminate the On-Site Sewage Facility and send the wastewater to the Bridgestone Municipal Utility District, which is the closest utility district to Spring Camp and Klein Park. The Bridgestone Municipal Utility District already provides water service to Spring Camp and Klein Park.
Expected Impact:
This project will reduce maintenance costs for the Precinct as well as prevent potential environmental hazards caused by an aging On-Site Sewage Facility in a public park.
Alternative Options:
If Bridgestone Municipal Utility District does not provide sewer service, then the project could not be constructed, and the Precinct would continue to incur increased maintenance costs related to the On-Site Sewage Facility.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H4: Consistently embed sustainability considerations in the project planning and design process.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
10/10/23 |
109 |
Approval to Negotiate |
|
3/26/24 |
57 |
Approved to execute an agreement with Sander Engineering Corporation |
|
4/10/25 |
253 |
Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for rehabilitation of the wastewater system in Spring Camp and Klein Park for Precinct 3 (25/0079) |
|
6/12/25 |
249 |
Approved to Award the construction contract for rehabilitation of |
Location:
Address (if applicable): 4531 Spring Cypress Road and 4603 Spring Cypress Road, Spring, TX 77379
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 3/4/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Service Agreement