File #: 26-0478    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/9/2026 In control: Commissioners Court
On agenda: 1/29/2026 Final action: 1/29/2026
Title: Request for approval of an award on the basis of low bid to Ceballos Construction, LLC (Primary) and Specialty Construction TX, LLC (Secondary) in the amount of $2,683,050 for concrete channel lining repairs (North) for the Flood Control District for the period of February 1, 2026 - January 31, 2027 with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (250338), MWBE Contracted Goal: 19.11%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250338

Vendor/Entity Legal Name (if applicable): Ceballos Construction, LLC (Primary); Specialty Construction TX, LLC (Secondary)

                     

MWBE Contracted Goal (if applicable): 19.11%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Ceballos Construction, LLC (Primary) and Specialty Construction TX, LLC (Secondary) in the amount of $2,683,050 for concrete channel lining repairs (North) for the Flood Control District for the period of February 1, 2026 - January 31, 2027 with four (4) one-year renewal options, and for the County Clerk to execute any applicable bonds to be received (250338), MWBE Contracted Goal: 19.11%.

end

 

Background and Discussion: This is a term contract for rapid repairs, and it consists of project work orders including concrete channel lining repairs for projects located within the northern portion of Harris County, Texas. Project work orders will include general concrete repairs with major emphasis on concrete channel lining repairs, including but not limited to full panel replacement, concrete lining - partial depth with engineered ductal mortar (EDM), headwall/wingwalls repairs with EDM, disposal of sediment accumulations on concrete lined channels, filling voids behind concrete channel lining, light erosion repair with granular 3” X 5” fill and riprap installation, pipe removal and replacement, outfall structure removal and replacement, small sections of concrete channel lining removal and replacement and related items.

 

Expected Impact: The expected impact of having this work order contract available is to quickly respond to smaller repairs. Maintenance Matters Prop “A” funds the labor and materials to expedite small repairs to address public concerns.  

 

 

Alternative Options: The alternative is to “do nothing” and process each small repair project individually, which may delay the response time.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/11/2025

430

Advertisement Approved

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

Concrete Channel Lining Repairs (North) for the Harris County Flood Control District

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other  O&M 2891

$

$2,683,050.00

$2,683,050.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$2,683,050.00

$2,683,050.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$2,683,050.00

$2,683,050.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/29/2026

Anticipated Implementation Date (if different from Court date): 1/29/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Helen Stallkamp, P.E.  Project Manager, Maintenance Engineering Department; Lyndsey Bars, Senior Buyer, Purchasing

 

Attachments (if applicable): Letter