File #: 25-3452    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/27/2025 In control: Commissioners Court
On agenda: 6/12/2025 Final action: 6/12/2025
Title: Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $30,196,418 for drainage improvements in the Humble Road Place and Parkland Estates Subdivisions (2018) for Precincts 1 and 2, and for the County Clerk to execute any applicable bonds to be received (250113), MWBE Contracted Goal: 24.534%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCAType of Request: Contract - Award

 

Project ID (if applicable): 250113

Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC

 

MWBE Contracted Goal (if applicable): 24.534%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $30,196,418 for drainage improvements in the Humble Road Place and Parkland Estates Subdivisions (2018) for Precincts 1 and 2, and for the County Clerk to execute any applicable bonds to be received (250113), MWBE Contracted Goal: 24.534%.

end

 

Background and Discussion:

This project is located in the North-East Houston area, in the proximity of the US-59 and Beltway 8

Interchange. Humble Road Place subdivision is located within the Precinct 1 boundaries, whereas Parkland

Estates lays within the Precinct 2 limits and both subdivisions are part of the Greens Bayou Watershed. The

northern part drains into HCFCD Unit No. P133-00-00 and the southern part into HCFCD Unit No. P100-00-00.

Over 250 residential structures have flooded during previous storm events, to include Hurricane Harvey. The

scope and proposed improvements include roadside ditch regrading, driveway culvert upgrades, underground

storm sewer network, and detention ponds. This contract amendment includes the effort for additional survey

and Geotech, and additional detailed design documents for the project.

 

Expected Impact:

In implementing the proposed drainage improvements, this project seeks to reduce structural flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to at least 100 residential structures within these two communities. This will reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact costs to the homeowners, Harris County, and FEMA.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the project may not be constructed.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/08/2025

424

Transmittal by Purchasing of a project scheduled for advertising

 

Location: Humble Road Place and Parkland Estates Subdivision

Address (if applicable): N/A

Precinct(s): Precincts 1 & 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund CDGB-MIT

$

$30,196,417.53

$30,196,417.53

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$30,196,417.53

$30,196,417.53

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$30,196,417.53

$30,196,417.53

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter, bid table