Title: Request for approval of an amendment to an agreement with Neel-Schaffer, Inc. in the amount of $36,851.25 for Construction Phase Services in connection with Mound Road Extension- SEGMENT 2, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 19.95%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN  24103MF3C501

Vendor/Entity Legal Name (if applicable): Neel-Schaffer, Inc.

 

MWBE Contracted Goal (if applicable): 19.95%

MWBE Current Participation (if applicable): N/A%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Neel-Schaffer, Inc. in the amount of $36,851.25 for Construction Phase Services in connection with Mound Road Extension- SEGMENT 2, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 19.95%.

.end

 

Background and Discussion:

This project extends Mound Road 0.86 miles east of Greenhouse Road to Cypress Drive. The project starts with

a 41 foot wide concrete pavement section that connects to a separate project (Segment 1). The pavement

section will then transition to a 24 foot wide asphalt pavement section. Pavement will end in a cul-de-sac. The

existing railroad crossing at Cypress Drive will be closed at the completion of the project. The project is

approximately 2,000 feet in length. Drainage will be a combination of swales and subsurface drainage. A

detention pond will be constructed that outfalls into Cypress Creek. An outfall will be constructed at Cypress

Creek. Due to the water depth exceeding the limits for a standard freshwater mussel survey, SCUBA divers are required to conduct the survey instead. This contract modification ensures the consultant is appropriately compensated for the additional effort.

 

Expected Impact:

The new roadway segment will ensure reliable and safe route of transportation to businesses and residents of

the Harris County.

 

 

 

alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the

project.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

1/9/2025

117

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 1070

$

$36,851.25

$36,851.25

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$36,851.25

$36,851.25

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$36,851.25

$36,851.25

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B