Primary Department: Toll Road Authority
Primary Department Head/Elected Official: Roberto Treviño, P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Proposals/Bids
Project ID (if applicable): 25/0024
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): 24.03%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to advertise for construction bids for the Scott Street at South Sam Houston Parkway East improvements project, as part of Barrier-Free HCTRA Program (Precinct 1, MWBE Contracted Goal: 24.03%).
end
Background and Discussion:
The Scott Street at South Sam Houston Parkway East improvements project provides ADA and pedestrian accessibility near the Sam Houston Parkway. The project also includes new signalized intersection at Scott Street and Brunswick Meadows Drive to improve vehicular, ADA and pedestrian accessibility. South Sam Houston Parkway East at Scott Street is high-risk due to inadequate pedestrian infrastructure. The project includes a new traffic signal at Scott Street and Brunswick Meadows Drive, 0.41 miles of sidewalk, and upgraded signage, striping, and turn lanes.
The project is justified by the study’s findings, addressing risks like missing sidewalks and poor signalization through new infrastructure. Part of HCTRA’s Barrier Free Program, it implements countermeasures like continental crosswalks and signals to reduce crashes. Coordination with Houston, TxDOT, and Harris County, enhancing safety and mobility in a critical corridor.
Expected Impact:
This project aligns with Harris County’s goals of providing a reliable, safe, sustainable, and evolving mobility system that meets the diverse connectivity needs of all Harris County residents. Funding from this project comes from Toll Road Authority.
Alternative Options:
No other recommended solutions for this identified need.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any): N/A
Date |
Agenda Item # |
Action Taken |
|
|
|
Location:
Address (if applicable): Scott Street & South Sam Houston Parkway East
Precinct(s): Precinct 1
Fiscal and Personnel Summary |
Service Name |
Tolling Operations |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$ |
$ |
$ |
Grants - Proposed Budget (For Grants Items only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 7/10/2025
Anticipated Implementation Date (if different from Court date): 10/15/2025
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority