Legislation Details

File #: 26-7783    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/11/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval of a change in contract with SER Construction Partners LLC, in connection with Treaschwig Rd A (Phase 2) - from west of Cypress Creek to 1,000' east of Birnam Wood Blvd - 2014, adding 5 calendar days, with an addition in the amount of $122,144.38, Job No. 25/0216-3, UPIN 23103MF2TA01, Precinct 3, MWBE Contracted Goal: 36.09%, MWBE Current Participation: 35.71%.
Sponsors: Mony Hossain
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0216, UPIN 23103MF2TA01

Vendor/Entity Legal Name (if applicable): SER Construction Partners, LLC

 

MWBE Contracted Goal (if applicable): 36.09%

MWBE Current Participation (if applicable): 35.71%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with SER Construction Partners LLC, in connection with Treaschwig Rd A (Phase 2) - from west of Cypress Creek to 1,000' east of Birnam Wood Blvd - 2014, adding 5 calendar days, with an addition in the amount of $122,144.38, Job No. 25/0216-3, UPIN 23103MF2TA01, Precinct 3, MWBE Contracted Goal: 36.09%, MWBE Current Participation: 35.71%.

end

 

Background and Discussion:

This project consists of the reconstruction and widening of Treaschwig Road (Phase 2) from west of Whittaker Way to East of Birnam Wood Boulevard. The scope includes drainage improvements, construction of a new bridge over the creek, traffic signal installation, striping, and all other miscellaneous safety enhancements required.

 

This change in contract includes:

(PCO #8, RFI #6) Due to field conflicts, the 48-inch CMP had to be relocated to an area not originally designated for tree clearing and grubbing.  The resulting additional tree-removal costs were reviewed and accepted by the Engineer of Record (EOR), Office of the County Engineer (OCE), and Precinct 3.

 

(PCO #9, RFI #29) Per Precinct request and proposal approval, CMP pipe North of the bridge will be extended to address concerns of water rising and carrying sediment into the pipe.  Further, rusted CMP pipe run on South side will also be replaced.  This proposal uses existing line items and has been approved by OCE and EOR, and Precinct.  Five additional days are added as part of this change order.

 

Expected Impact:

These changes are necessary to address field conflicts and added improvements encountered during construction. The work will maintain project progress and improve old infrastructure.

 

Alternative Options:

None at this time.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/26/2025

454 (25-5498)

Contract Award

02/12/2026

24 (26-0865)

Contract Amendment for additional funds and extension of project term

08/06/2026

56 (26-5189)

Contract Amendment for additional funds

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources:

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3002

$

$122,144.38

$122,144.38

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$122,144.38

$122,144.38

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$122,144.38

$122,144.38

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B