Legislation Details

File #: 24-2685    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 4/24/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval to negotiate with Concept Engineers, Inc. for Professional Engineering Services in connection with Maintenance - Clear Lake Park Bulkhead Replacement, UPIN 24102MF3BG01, Precinct 2.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, Env SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 24102MF3BG01

Vendor/Entity Legal Name (if applicable): Concept Engineers, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with Concept Engineers, Inc. for Professional Engineering Services in connection with Maintenance - Clear Lake Park Bulkhead Replacement, UPIN 24102MF3BG01, Precinct 2.

end

 

Background and Discussion:

This request will allow Harris County to start negotiations with Concept Engineers, Inc. to provide engineering services related to the design and construction of the bulkhead replacement at Clear Lake Park (Approximately 600 LF). The bulkhead is connected to Clear Lake (Armand Bayou B100-00-00).

 

Expected Impact:

This project aims to ensure safety, address overdue maintenance, and create an enhanced environment for the constituents to enjoy the nearby parks and Boat launches.

 

Alternative Options:

If no action is taken, the deterioration of the existing bulkhead at Clear Lake Park will continue, leading to increased maintenance costs and potential safety hazards. Delaying this project could result in a life safety hazard due to the unstable waterfront structure.

Alternative mitigation strategies, such as temporary repairs or partial replacements, have been considered but were found to be less cost-effective and unlikely to offer a long-term solution.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

None

 

Location:

Address (if applicable): 16125 E Channelview Dr, Channelview, TX 77530.

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$0.00

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$0.00

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$0.00

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: May 07, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., Senior Director, Capital Project Infrastructure,

Harris County Engineering Department.

Attachments (if applicable): N/A