File #: 26-7823    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/13/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval of a change in contract with Hassell Construction Group, LLC in connection with Hufsmith-Kohrville Rd 3, with an addition in the amount of $14,744.13, Job No. 25/0352-1, UPIN 15104M23NP03, Precinct 3, MWBE Contracted Goal: 33.31%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0352, UPIN 15104M23NP03

Vendor/Entity Legal Name (if applicable): Hassell Construction Group, LLC

 

MWBE Contracted Goal (if applicable): 33.31%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hassell Construction Group, LLC in connection with Hufsmith-Kohrville Rd 3, with an addition in the amount of $14,744.13, Job No. 25/0352-1, UPIN 15104M23NP03, Precinct 3, MWBE Contracted Goal: 33.31%.

end

 

Background and Discussion:

The project section of road reconstruction and drainage improvements of Hufsmith-Kohrville Road - Segment 3A from North of Ezekiel Road to North of Boudreaux Road.  This change in contract allows contractor to install temporary wood poles to provide the necessary support for the temporary traffic signal equipment while the permanent traffic signal poles are being procured, fabricated, and delivered, thereby maintaining the project schedule and ensuring a safe and fully functional temporary traffic signal operation.

 

The change in contract includes the following:

•                     Temporary Poles Installation and Removal $ 14,744.13

 

Expected Impact:

This change will allow the Contractor to be properly compensated for the additional work.

 

 

 

Alternative Options:

Conduct thorough pre-construction assessments and detailed utility mapping to identify and mitigate potential conflicts early.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/19/2026

259 (26-1765)

Contract Award

 

Location:

Address (if applicable): Hufsmith-Kohrville Rd & Ezekiel Rd. Tomball, Texas 77375

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$14,744.13

$14,744.13

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$14,744.13

$14,744.13

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$14,744.13

$14,744.13

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B