Legislation Details

File #: 26-5493    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 8/12/2026 In control: Commissioners Court
On agenda: 8/25/2026 Final action: 8/25/2026
Title: Request for approval of an amendment to an agreement with GFT, Inc. in an amount of $410,560.80 for professional engineering services to conduct Design Phase Services for Subdivision Improvements - Arcadian Gardens Phase 1, UPIN 24103MF3E801, Precinct 3, MWBE Contracted Goal: 16.09%, MWBE Current Participation: 51.85%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 24103MF3E801

Vendor/Entity Legal Name (if applicable): GFT, Inc.

 

MWBE Contracted Goal (if applicable): 16.09%

MWBE Current Participation (if applicable): 51.85%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with GFT, Inc. in an amount of $410,560.80 for professional engineering services to conduct Design Phase Services for Subdivision Improvements - Arcadian Gardens Phase 1, UPIN 24103MF3E801, Precinct 3, MWBE Contracted Goal: 16.09%, MWBE Current Participation: 51.85%.

end

 

Background and Discussion:

The Arcadian Gardens area is an older subdivision with 18-ft to 20-ft wide road pavement and ditches along both sides of the roadway. The existing right of way is generally 60-ft in width. The precinct plans to create a multi-phase approach to remove roadside ditches and construct 5-ft wide sidewalks by installing storm-sewer system. The intent of this project is to conduct a comprehensive drainage analysis, environmental and geotechnical study followed by design and construction phases that Precinct can fund through grant programs. 

 

Expected Impact:

The proposed project will guide the phased replacement of roadside ditches with storm-sewer system and construct 5-ft wide sidewalks. This project seeks to enhance pedestrian safety and provide drainage improvements within the project limit. It will support grant funding efforts and enable a cost-effective multi-phase implementation plan aligned with available resources.

 

 

Alternative Options:

If no action is taken, the project may experience delays in improvements to Arcadian Gardens subdivision.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/23/2024 06/26/2025

143 20

Authorization to Negotiate Professional Services Agreement (Study Phase)

 

Location: Arcadian Gardens Subdivision (Barrett Station)

Address (if applicable): 808 Magnolia Avenue, Crosby, Texas 77532

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1040 - FLEX Fund

$

$410,560.80

$410,560.80

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$410,560.80

$410,560.80

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$410,560.80

$410,560.80

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/25/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract & Exhibits