Legislation Details

File #: 26-1209    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/11/2026 In control: Commissioners Court
On agenda: 2/26/2026 Final action: 2/26/2026
Title: Request for approval to execute an agreement with LJA Engineering, Inc., in the amount of $760,562.00, for professional engineering services in connection with Design of Bridge Replacement - Woodforest Blvd at Carpenters Bayou, UPIN 25102MF3QH01, Precinct 2, MWBE Contracted Goal: 19.67%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 25102MF3QH01

Vendor/Entity Legal Name (if applicable): LJA Engineering, Inc.

 

MWBE Contracted Goal (if applicable): 19.67%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with LJA Engineering, Inc., in the amount of $760,562.00, for professional engineering services in connection with Design of Bridge Replacement - Woodforest Blvd at Carpenters Bayou, UPIN 25102MF3QH01, Precinct 2, MWBE Contracted Goal: 19.67%.

end

 

Background and Discussion:

Harris County Precinct 2 (PCT2) has requested that the Harris County Engineering Department (HCED) to prepare the design documents for the bridge replacement - Woodforest Blvd at Carpenters Bayou project in Harris County, Texas, Precinct 2. This project consists of crossing of two twin concrete bridges running east-west, each approximately 127 feet long with three spans supported by concrete substructures. Constructed in 1970 and 1982, the bridges accommodate two lanes of traffic on a low-speed (30 mph) road with an average daily traffic volume of approximately 12,000 vehicles. Both bridges need extensive repairs, so the decision was made to replace them. A phasing plan will be developed for bridge replacement with limited roadway reconstruction. This project will include Drainage Analysis, Survey, Geotechnical, SUE, Traffic Control, and Environmental for the project area.

 

 

Expected Impact:

LJA Engineering, Inc. will prepare construction documents for the design phase, basic and additional services, for the Woodforest Blvd at Carpenters Bayou Bridge Replacement project.

 

 

Alternative Options: If no action is taken, the provision of professional engineering services will be delayed.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): Vendor Pool

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Woodforest Blvd Bridges at Carpenters Bayou, Houston, TX 77015

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109-Commerical Paper

$

$760,562.00

$760,562.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$760,562.00

$760,562.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$760,562.00

$760,562.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/26/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services,

Office of the County Engineer

 

Attachments (if applicable): Contract and Exhibits