Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0463, UPIN 21103N306430001
Vendor/Entity Legal Name (if applicable): Solid Bridge Construction, LLC
MWBE Contracted Goal (if applicable): 24%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Solid Bridge Construction, LLC, in connection with Detention Basin Enhancement Program - Cypress - 2021, with an addition in the amount of $5,200.00, Job No. 23/0463-1, UPIN 21103N306430001, Precinct 3, MWBE Contracted Goal: 24%.
end
Background and Discussion:
The (K500-01-00 Detention Basin Expansion) project site consists of stormwater detention basin located northwest of Harris County in Cypress Creek Watershed, discharging into Harris County Flood Control Channel K100-01-00 Cypress Creek.
The change involves adding a missing item to the contract, increasing the current contract value by $5,200.00 to ensure the project is completed as originally intended.
Item to be added:
(PCO 1) - Removal and Disposal of 48” HDEP Pipe, Cost: $5,200.00, Additional Days: 0 Days
80 LF x $65/LF = $5,200.00
Expected Impact:
The overall objective for this project is to provide stormwater detention storage to mitigate drainage improvements to the Dowdell Woods & Cypress Creek Estates Subdivisions that drain to Cypress Creek. This change enables the addition of a new item to the contract, ensuring the project aligns with the original intent and complies with precinct requirements.
Alternative Options:
No alternative options. If no action is taken, the full intended functionality of the Detention Basin master plan will not be achieved. The pond will not be able to provide the proposed drainage improvements to reduce flooding risks.
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complete and implement the Flood Resilience Plan.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
06/04/2024 |
379 (24-3216) |
Contract Award |
Location:
Address (if applicable):
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Other 3109 |
$ |
$5,200.00 |
$5,200.00 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$5,200.00 |
$5,200.00 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$5,200.00 |
$5,200.00 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 5/8/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B