Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): Job No. 24/0107, UPIN 19101MF0YC01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Office of the County Engineer of the change to the electric meter ESID number from 1008901025001857270121 to 1008901025005194260125 for Carpenters Bayou - Trails and Pedestrian Bike Bridge, UPIN 19101MF0YC01, Precincts 1 and 2.
end
Background and Discussion:
Harris County proposes the construction of a sidewalk along Wallisville Road from Beltway 8 to Hidden Park Drive and
provide new crosswalks at Wallisville Road and at Carpenters Landing Way. A traffic signal warrant analysis was completed for the intersection of Wallisville Road at Carpenters Landing Way, in front of Aguirre Junior High School.
Expected Impact:
In issuing the new ESID number, CenterPoint Energy Houston Electric, LLC will be able to assign an account to the County for electric service to the traffic signal. The signal will be energized with a valid account for quantifying the consumption
of electric charge.
Alternative Options:
No alternative option. Electric service is required for the traffic signal to function.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: n/a
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
2/26/2019 |
1.f.1 |
Recommendation that the County Judge execute an amendment and agreements with: Omega Engineers, Inc., in the amount of $565,432 for engineering services for improvements to Carpenters Bayou trail and pedestrian bike bridge from Flintcrest Drive to Aguirre Middle School in Precinct 1 (UPIN 19101MF0YC01). |
|
4/28/2020 |
1.o.1 |
Recommendation that the court approve study reports prepared by: Omega Engineers, Inc., for the Carpenters Bayou trail and pedestrian bike bridge project in Precinct 1, and authorization to proceed with the design phase (UPIN 19101MF0YC01). |
|
10/13/2020 |
44. |
Request for approval to execute a service outlet location statement for installation of an electric meter with CenterPoint Energy, LLC and authorize the county auditor to pay monthly bills at 15731 ½ Wallisville Rd (intersection of Wallisville Road at Carpenters Landing Way) for electrical power serving a traffic signal, UPIN 19101MF0YC01, Precinct 1. |
|
4/23/2024 |
145. |
Request for approval to negotiate with Tolunay Engineering Group Inc. for Professional Engineering Services regarding construction materials testing and related services for Carpenters Bayou - Trails and Pedestrian Bike Bridge - 24/0107, 19101MF0YC01, Precinct 1. |
|
7/15/2024 |
50. |
Request for approval to execute an agreement with OMEGA Engineers Inc in the amount of $62,634 for Construction Phase Services in connection with Carpenters Bayou - Trails and Pedestrian Bike Bridge - 24/0107, UPIN 19101MF0YC01, Precincts 1 and 2, Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program. |
Location: Wallisville Road at Carpenters Landing Way
Address (if applicable): 15731 ½ Wallisville Road, Houston, Texas, 77049
Precinct(s): Precincts 1 & 2
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 4/10/2025
Anticipated Implementation Date (if different from Court date): n/a
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Engineering Department
Attachments (if applicable): Service Outlet Location Statement Form