File #: 26-4779    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/16/2026 In control: Commissioners Court
On agenda: 7/30/2026 Final action: 7/30/2026
Title: Request for approval of a change in contract with MB Western Construction Co., in connection with Houmont Park Subdivision Drainage Improvements - 2018 (P117-00-00), adding 273 calendar days, with an addition in the amount of $53,552.04, Job No. 25/0142-1, HC Commercial Paper Fund, UPIN 19101MF14G01-2, Precinct 1, MWBE Contracted Goal: 27.17%, MWBE Current Participation: 100%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0142, UPIN 19101MF14G01-2

Vendor/Entity Legal Name (if applicable): MB Western Construction Co.

 

MWBE Contracted Goal (if applicable): 27.17%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with MB Western Construction Co., in connection with Houmont Park Subdivision Drainage Improvements - 2018 (P117-00-00), adding 273 calendar days, with an addition in the amount of $53,552.04, Job No. 25/0142-1, HC Commercial Paper Fund, UPIN 19101MF14G01-2, Precinct 1, MWBE Contracted Goal: 27.17%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

The Houmont Park Subdivision Drainage Improvements - HCFCD Unit No. P117 00-00 project site consists of subdivision drainage improvements located between Red Bird Ln and C E King Parkway. The project includes roadside ditch improvements along Unison Rd and Ticonderoga Rd and channel improvements on P117-00-00. The work activities include roadside ditch improvements and filling roadside ditches where ditches are greater than 4-foot in depth and replacing them with underground storm sewer system

 

The change in contract includes the following:

 

The line items have been adjusted to reconcile overrun and underrun quantities and to add new line items necessary to complete the proposed scope of work.

 

•         The decrease of quantities on underrun line item 30 and 27 for a decrease in the amount of $72,495.00.

 

•         The increase of quantities on overrun line item 26 for an increase in the amount of $25,560.00.

 

New Line Items:

 

•         Added 273 calendar days for utility relocation delays associated with multiple CenterPoint gas line, gas service line, and utility pole conflicts encountered throughout the project limits, with no additional cost.

 

•         Add a new pay item 108 for Dense-Graded Hot-Mix Asphalt (Ty-D Sac-A PG64-22) (2 in Thick) at a unit price of $191.04 per ton for total of 526 tons, total amount of $100,487.04 with 0 days.

 

The above additions and deductions result in a net change in the amount of $53,552.04 and 273 calendar days.

 

The County issued the Project’s Notice to Proceed on 07/28/2025. Per Attachment M of the Contract, the work was to be completed within 300 days of the Notice to Proceed, or by 05/24/2025. With this and all other prior approved change orders, the work is to be completed within 573 days of the Notice to Proceed, or by 02/21/2027.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Houmont Park subdivision

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/27/2025

564 (25-1840)

Transmittal - Advertisement

07/10/2025

134 (25-4322)

Contract Award - MB Western Construction Co.

 

Location: Houmont Park Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$53,552.04

$53,552.04

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$53,552.04

$53,552.04

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$53,552.04

$53,552.04

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/30/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 