Legislation Details

File #: 26-4839    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 7/16/2026 In control: Commissioners Court
On agenda: 7/30/2026 Final action: 7/30/2026
Title: Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Willow Tree Development Services, Ltd. in the amount of $7,466,377 for construction of the Kluge Stormwater Detention Basin - Phase 3 - for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260105), MWBE Contracted Goal: 16%.
Attachments: 1. 26-4839 Transmittal Award Job No. 260105 - Willow Tree Development Services, Ltd

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Marcus Stuckett

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): 260105

Vendor/Entity Legal Name (if applicable): Willow Tree Development Services, Ltd.

 

MWBE Contracted Goal (if applicable): 16%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Willow Tree Development Services, Ltd. in the amount of $7,466,377 for construction of the Kluge Stormwater Detention Basin - Phase 3 - for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260105), MWBE Contracted Goal: 16%.

end

 

Background and Discussion:

The Kluge Stormwater Detention Basin - Phase 3 project comprises the excavation of a new wet bottom stormwater detention basin. The project is being constructed using Community Development Block Grant Disaster Recovery (CDBG-DR) funds.

 

The scope of work includes the excavation and offsite disposal of approximately 468,316 cubic yards of material to facilitate the construction of a new wet bottom stormwater detention basin. Construction activities include site clearing and grubbing, excavation and offsite disposal, pedestrian access tunnel, site grading, and the development of maintenance access path, all in accordance with the approved plans.

 

Expected Impact:

The objective of the project is to maximize stormwater storage capacity in the Little Cypress Creek watershed and reduce flood risk in the surrounding communities.

 

Alternative Options:

The No Action Alternative would fail to meet the purpose and needs of mitigating flood risk and provide additional system capacity for this Community Development Block Grant Disaster Recovery (CDBG-DR) funded project. Under the No Action Alternative, area residents would continue to be affected by area flooding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/16/2026

375

Transmittal by Purchasing of a project scheduled for advertisement

 

 

 

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$7,466,377.20

$7,466,377.20

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$7,466,377.20

$7,466,377.20

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$7,466,377.20

$7,466,377.20

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 7/30/2026

 

Anticipated Implementation Date (if different from Court date): 6/23/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Adam Eaton, PE, ENV SP, CFM, Project Manager, CDGB Program; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter, Bid Table