File #: 24-6493    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/2/2024 In control: Commissioners Court
On agenda: 10/8/2024 Final action: 10/8/2024
Title: Request by the Office of the Purchasing Agent for approval on the basis of highest overall evaluation and authorize negotiations with Michael Baker International, Inc. for professional engineering, support services, and construction phase services for channel improvements, stormwater detention basin, and bridge replacements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240167), MWDBE Contracted Goal: 20%.
Attachments: 1. 24-6493 Supplemental Job No. 240167 Award Michael Baker International, Inc.

Department: Purchasing

Department Head/Elected Official: Paige McInnis

 

Regular or Supplemental RCA: Supplemental RC

Type of Request: Contract - Award

 

Project ID (if applicable): 240167

Vendor/Entity Legal Name (if applicable): Michael Baker International, Inc.

 

MWDBE Contracted Goal (if applicable): 20%                     

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request by the Office of the Purchasing Agent for approval on the basis of highest overall evaluation and authorize negotiations with Michael Baker International, Inc. for professional engineering, support services, and construction phase services for channel improvements, stormwater detention basin, and bridge replacements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree to an executable contract (240167), MWDBE Contracted Goal: 20%.

end

Background and Discussion: This is a request to authorize negotiation for an agreement that will provide final design, bidding and construction phase services for C147-00-00 Channel Improvements, Stormwater Detention Basin, and Bridge Replacements - Phases 1B, 1C, 2 & 3.

 

Expected Impact: The project seeks to reduce flood risks and strengthen resiliency in the Sims Bayou watershed by reducing the overall water surface elevation (WSEL) by 2.8 feet based on a 100-year storm event. This also includes removal of 164 structures, 4.15 miles of roadway and 70 acres from the floodplain area. 

 

Alternative Options: The alternative to approving this item would be select another firm, which would result in significant delays in completing this project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

 

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/4/2024

358

Advertisement of Project Approved

 

Location: HCFCD Unit C118-00-00

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/8/2024

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department:  Samson D’Silva, P.E., Engineering Project Manager, Capital Projects South, Jared Abbey, Sourcing Manager, Harris County Purchasing

Attachments (if applicable):