Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN - 25103MF3MV01
Vendor/Entity Legal Name (if applicable): Pape-Dawson Consulting Engineers, LLC dba Pape-Dawson Engineers, LLC
MWBE Contracted Goal (if applicable): 1.75%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC in the amount of $72,760.00 for Professional Engineering and related services in connection with Construction Phase Services of Roadway Maintenance - Asphalt Package -1- 2025, UPIN 25103MF3MV01, Precinct 3, MWBE Contracted Goal: 1.75%.
end
Background and Discussion:
Precinct 3 is requesting the Office of the County Engineer to enter into an agreement for professional engineering services to provide Construction Phase services for the subject maintenance project which consists of mill & overlay with base repairs on Spring Cypress Road and Louetta Road within Precinct 3. The total length of the project is 2.7 miles of roadway, covering the subject roads. Spring Cypress Road is a 4-lane (with cont. turn lane) asphalt major thoroughfare within 120-ft of ROW with 11-ft lanes, 1 concrete channel crossing over Spring Gully (VH-SPC16006) and open ditches. The corridor is on the HC road log. Louetta Road is a 4-lane (with cont. turn lane) asphalt major thoroughfare within 100-ft of ROW, with 11-ft lanes, 1 concrete channel crossing over Dry Gully (VH-LOU11005) and open ditches.
Expected Impact:
The maintenance project will improve the road quality for the community in the specified area.
Alternative Options:
Without this project, the road cannot be maintained properly. The goal is to provide better mobility and/or eliminate hazards from the roadway as requested by the Precinct.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
10/29/2024 |
127 (24-6612) |
Request for approval to negotiate with Pape Dawson Consulting Engineers, Inc. for Professional Engineering and related services in connection with Roadway Maintenance - Asphalt Package -1- 2025, UPIN 25103MF3MV01, Precinct 3. |
|
02/13/2025 |
7 (25-1139) |
Request for approval to execute an agreement with Pape Dawson Consulting Engineers, LLC dba Pape-Dawson Engineers, LLC in the amount of $88,048.00 for Professional Engineering and related services in connection with RoadwayMaintenance-AsphaltPackage-1-2025, UPIN25103MF3MV01, Precinct3, MWBE Contracted Goal: 1.75%, MWBE Current Participation: 32.93%. |
Location:
Address (if applicable): Spring Cypress Rd from W of Stuebner Airline to E. of TC Jester; Louetta Rd: from Old Louetta to E. of Champion Forest Houston, TX 77379
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Other 3109 |
$ |
$ 72,760.00 |
$ 72,760.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ 72,760.00 |
$ 72,760.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ 72,760.00 |
$ 72,760.00 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 12/11/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Contract exhibits and Agreement