File #: 26-2878    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/29/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval of an amendment to an agreement with Engineers & Consultants Inc. in the amount of $10,450.00 for Professional Architecture and Engineering Services in connection with replacing the heating and air conditioning (HVAC) system at Annex 8, 701 West Baker Rd, Baytown, TX 77521, UPIN 24208MF2Z401, Precinct 2.
Attachments: 1. 26-2878-CIC - 24208MF2Z401 - 701 W Baker Rd - 2023 - Engineers Consultants Inc - 5.16.26 updated

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): 24208MF2Z401

Vendor/Entity Legal Name (if applicable): Engineers & Consultants Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Engineers & Consultants Inc. in the amount of $10,450.00 for Professional Architecture and Engineering Services in connection with replacing the heating and air conditioning (HVAC) system at Annex 8, 701 West Baker Rd, Baytown, TX 77521, UPIN 24208MF2Z401, Precinct 2.

end

 

Background and Discussion:

Engineers & Consultants Inc. was approved as the prime consultant to begin negotiations for the design and construction for replacement of all air handling units and electrical lighting fixtures at the existing building at 701 West Baker Rd Baytown, TX 77521. The evaluations include a review of existing building conditions, producing as-built drawings reflecting existing site conditions, cost estimates for recommended design and construction approach and emphasizing architectural design elements that support an efficient and cohesive operational environment for the end users.

 

Expected Impact:

The approval of this agreement would allow the design firm Engineers & Consultants Inc. to conduct the necessary site assessments, complete design phases and cost estimates to accommodate the increasing demands for mechanical services at the existing facility and improve overall functionality.  These enhancements will help modernize the facility, improve overall efficiency, and strengthen service delivery to the surrounding community.

 

Alternative Options:

The alternative option for this project would be to continue functions with existing mechanical units that may not be able to accommodate the increasing user demands, are old and obsolete, and will break and cause additional resources to be applied to fix and maintain aged systems. 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

4/25/2023

46

Agreement

 

Location:

Address (if applicable): 701 West Baker Rd., Baytown, TX 77521

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper (208)

$

$ 10,450.00

$ 10,450.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$ 10,450.00

$ 10,450.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$ 10,450.00

$ 10,450.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Exhibit Attachments