Title: : Recommendation to accept a Preliminary Engineering Report titled "Channel Conveyance Improvements along Harris County Flood Control Unit B104-00-00" and proceed with design and construction for the channel conveyance improvements on HCFCD Unit B104-00-00, including tributaries B104-04-00, B204-04-00, and B104-08-00. (Armand Bayou Watershed, Bond ID CI-023, Project ID B104-00-00-E002, Precinct 2).

To:                                                               Harris County Commissioners Court

 

Through:                                          Russell A. Poppe, P.E., Executive Director, Harris County Flood Control District

prepared

Prepared By:                                          Matthew K. Zeve, P.E., Deputy Executive Director, Harris County Flood Control District

 

Subject:                                           Accept Preliminary Engineering Report

end

Project ID (If applicable]: B104-00-00-E002

 

Purpose and Request:

title:

Recommendation to accept a Preliminary Engineering Report titled “Channel Conveyance Improvements along Harris County Flood Control Unit B104-00-00” and proceed with design and construction for the channel conveyance improvements on HCFCD Unit B104-00-00, including tributaries B104-04-00, B204-04-00, and B104-08-00. (Armand Bayou Watershed, Bond ID CI-023, Project ID B104-00-00-E002, Precinct 2).

end

Background and Discussion:

The purpose of this Preliminary Engineering Report was to study the channel conveyance improvements on Harris County Flood Control District Unit No. B104-00-00, including Tributaries B104-04-00, B204-04-00, and B104-08-00, and was prepared by IDS Engineering Group.  The purpose of this project is to provide a 1% storm event level of service within the B104-00-00 watershed by improving conveyance on the channel B104-00-00 and expanding an existing stormwater detention basin. A community engagement meeting was held for this project on July 30, 2020.

 

Fiscal Impact:

There is no cost associated with this court item.

 

Fiscal Summary

 Expenditures

FY 20-21

FY 21-22 Projected

Future Years Projected [3 additional years]

Service Impacted:  4.a.3 - Engineering

 

 

 

Existing Budget

$0

$0

$0

Additional Appropriation Requested

$0

$0

$0

Total Expenditures

$0

$0

$0

Funding Sources

$0

$0

$0

Existing Department Budget

$0

$0

$0

Please Identify Funding Source (General Fund, PIC, Special Revenue, Grant, Etc.)

$0

$0

$0

2018 HCFD Bond Program - CI-023*

$0

$0

$0

Total Sources

$0

$0

$0

 

Alternatives:

 The alternative should this PER not be approved is that we could not proceed to the final design phase of this project.  

 

Alignment with Strategic Objective:

SO1.1 - Continuously plan CIP projects to improve conveyance capabilities of Harris County through addition of assets to FCD infrastructure and improving existing assets within FCD's existing infrastructure.

 

SO2.1 - Reducing flooding risks across Harris County by completing projects in the 2018 Harris County Flood Control District Bond Program by 2030.

                     

Attachments: n/a