To: Harris County Commissioners Court
Through: Russell A. Poppe, P.E., Executive Director, Harris County Flood Control District
prepared
Prepared By: Matthew K. Zeve, P.E., Deputy Executive Director, Harris County Flood Control District
Subject: Accept Preliminary Engineering Report
end
Project ID (If applicable]: B104-00-00-E002
Purpose and Request:
title:
Recommendation to accept a Preliminary Engineering Report titled “Channel Conveyance Improvements along Harris County Flood Control Unit B104-00-00” and proceed with design and construction for the channel conveyance improvements on HCFCD Unit B104-00-00, including tributaries B104-04-00, B204-04-00, and B104-08-00. (Armand Bayou Watershed, Bond ID CI-023, Project ID B104-00-00-E002, Precinct 2).
end
Background and Discussion:
The purpose of this Preliminary Engineering Report was to study the channel conveyance improvements on Harris County Flood Control District Unit No. B104-00-00, including Tributaries B104-04-00, B204-04-00, and B104-08-00, and was prepared by IDS Engineering Group. The purpose of this project is to provide a 1% storm event level of service within the B104-00-00 watershed by improving conveyance on the channel B104-00-00 and expanding an existing stormwater detention basin. A community engagement meeting was held for this project on July 30, 2020.
Fiscal Impact:
There is no cost associated with this court item.
|
Fiscal Summary |
|
Expenditures |
FY 20-21 |
FY 21-22 Projected |
Future Years Projected [3 additional years] |
|
Service Impacted: 4.a.3 - Engineering |
|
|
|
|
Existing Budget |
$0 |
$0 |
$0 |
|
Additional Appropriation Requested |
$0 |
$0 |
$0 |
|
Total Expenditures |
$0 |
$0 |
$0 |
|
Funding Sources |
$0 |
$0 |
$0 |
|
Existing Department Budget |
$0 |
$0 |
$0 |
|
Please Identify Funding Source (General Fund, PIC, Special Revenue, Grant, Etc.) |
$0 |
$0 |
$0 |
|
2018 HCFD Bond Program - CI-023* |
$0 |
$0 |
$0 |
|
Total Sources |
$0 |
$0 |
$0 |
Alternatives:
The alternative should this PER not be approved is that we could not proceed to the final design phase of this project.
Alignment with Strategic Objective:
SO1.1 - Continuously plan CIP projects to improve conveyance capabilities of Harris County through addition of assets to FCD infrastructure and improving existing assets within FCD's existing infrastructure.
SO2.1 - Reducing flooding risks across Harris County by completing projects in the 2018 Harris County Flood Control District Bond Program by 2030.
Attachments: n/a